Cross Lane House Knott Top Pateley Bridge North Yorkshire HG3 5NH Data via plota.co.uk

26/06399/FUL - Full permission Registered

Proposal

Installation of a single wall-mounted electric vehicle charging point Data via plota.co.uk

View original council record ↗Last checked

North Yorkshire Council is publishing its Harrogate applications late: so far it has put about half of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
2 Oct 2026
✓
Validated
18 Oct 2026
✓
Consultation
30 Oct 2026
Decision
Expected by 13 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 12 Dec 2026 and 20 Dec 2026, from Harrogate's recent utility and infrastructure works.

Comments are open until 6 Dec 2026

Comment on this application ↗

Site constraints 8

Grade II listed: Cross Lane House
List entry 1150508 · 2 m away
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Nidderdale National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Public bridleway 13 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 3; Coalfield, development low risk area; Priority habitat 20 m away: Upland hay meadow.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area226 m² (2,433 sq ft)
Energy ratingE (54 out of 100), could reach C
PropertyDetached house, 9 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, oil
WallsGranite or whinstone, as built, no insulation (assumed)

From the energy performance certificate lodged in October 2020, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Harrogate - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Harrogate
Application type
Full permission
Postcode
HG3 5NH
Received
2 Oct 2026
Validated
18 Oct 2026
Ward
Pateley Bridge & Nidderdale
Parish
High and Low Bishopside
Case officer
Show
Target decision
13 Dec 2026
Decision level
Chief Planner
Applicant
Show
Agent
Help With Planning Ltd

Decision outlook

Day 36 of the 56-day target. Harrogate usually decides utility and infrastructure works by day 56.

Day 3620 days to the 56-day target
53%decided within 8 weeks
94%approved
34decided in the last year

Plota live figures for utility and infrastructure works decided by Harrogate in the last twelve months, from validation. Harrogate decision record →

Public comments

No public comments yet.

Last counted 13 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15266836
Planning Portal ref
PP-15266836
Consultation
30 Oct 2026
Comments by
6 Dec 2026
Site or press notice
6 Nov 2026
Statutory expiry
13 Dec 2026
Env. assessment
No

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.