Former Buckland Mill Crabble Hill Dover Data via plota.co.uk

25/01097 - Removal or Variation of Condition(s) Approved

Proposal

Variation of Condition 5, 10, 11, 14 and 31 of Outline permission for the erection of up to 135 dwellings, access, associated parking, road/footways, open space, surface water drainage, and ancillary works (appearance, landscaping, layout and scale reserved) to vary wording of conditions 5, 10, and 31 to be linked to any future residential phase, rather than the first RMA on site, Condition 11 to be linked to each RMA phase and not whole site and amendment to wording of condition 14 to include mitigation strategy. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Oct 2025
✓
Validated
7 Oct 2025
✓
Consultation
17 Oct 2025
✓
Approved
6 Feb 2026

Approved on 6 Feb 2026 · Delegated · Last checked 13 Oct 2026

Associated applications 3

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
1 listed building within 150 m; Flood defence 3 m away (engineered high ground, designed for a 1 in 5 year flood); National landscape 262 m away: Kent Downs; Coalfield, development low risk area; Inside the Dover built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dover - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dover
Application type
Removal or Variation of Condition(s)
Received
6 Oct 2025
Validated
7 Oct 2025
Ward
St Radigunds
Parish
DOVER
Case officer
Show
Target decision
6 Feb 2026
Decision
Grant Outline Permission
Decision date
6 Feb 2026
Decision level
Delegated
Agent
Tetra Tech

Public comments

No public comments yet.

Last counted 13 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Site or press notice
17 Oct 2025
Statutory expiry
6 Jan 2026
Env. assessment
No
Dover
Planning Authority Score
7.4/10
Good
#46 of 296 overall
Relevant to this application:
Major dwellings

Dover is one of the fastest councils in England for householder decisions: #28 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dover decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #151 of 296
92%
Householder approved
Above avg (90%) #151 of 296
83%
Decided in 8 weeks
Above avg (63%) #28 of 296
31%
Extended time limit
Below avg (41%) #57 of 296
72%
Minor dwellings approved
105 decided (1-9 homes)
83%
Major dwellings approved
18 decided (10+ homes)
82%
Change of use approved
56 decided
772
Total decisions
89 refused in the year to March 2026