Land to the West of, Rooksbridge Road, Rooksbridge, Axbridge, Somerset, BS26 Data via plota.co.uk

24/25/00011 - Prior Approval Agricultural to Dwelling Refused

Proposal

Application to determine if prior approval is required for a proposed: Change of Use of Agricultural Buildings to 1 No. Dwellinghouses (Class C3), and associated building operations. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Jul 2025
✗
Refused
2 Sept 2025
Appeal
Not lodged

Refused on 2 Sept 2025 · Last checked 16 Oct 2026

Site constraints 5

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Priority habitat: Coastal and floodplain grazing marsh
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Restorable Habitat
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project about 680 m away: Hinkley Point C Connection
The site is about 680 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Hinkley Point C Connection Project Material Change (at pre-application, about 611 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sedgemoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sedgemoor
Application type
Prior Approval Agricultural to Dwelling
Received
9 Jul 2025
Validated
9 Jul 2025
Parish
East Brent
Case officer
Show
Decision
Prior Approval Refused
Decision date
2 Sept 2025
Applicant
Show
Agent
Hill Reading Architects, Hill Reading Architects

How this decision compares

Decided in 55 days from validation, 30 days slower than Sedgemoor's median of 25 for prior approvals. Refused, as 10% of prior approvals here are.

95%decided within 8 weeks
90%approved
133decided in the last year

Plota live figures for prior approvals decided by Sedgemoor in the last twelve months, from validation. Sedgemoor decision record →

Consultation & key dates

Consultation
30 Jul 2025
Comments by
21 Aug 2025