Ceme Innovation Centre Marsh Way Rainham RM13 8EU Data via plota.co.uk

P1042.25 Approved

Proposal

Delivery of a shared use route through the Centre of Engineering and Manufacturing Excellence (CEME) Innovation Campus from the entrance into the site from the A13 westbound offslip to the exit road at the junction with Marsh Way. The route going through CEME is part of a wider Active Travel Corridor being delivered either side of the CEME site. This planning application is specifically for the section of the route going through CEME as this is not adopted highway. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2025
✓
Validated
21 Aug 2025
✓
Approved
17 Oct 2025

Approved on 17 Oct 2025 · Last checked 14 Oct 2026

Associated applications 2

  • P1042.25This application
    Delivery of a shared use route through the Centre of Engineering and Manufacturing Excellence (CEME) Innovation Campus…

Site constraints 9

Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Archaeological priority area: Potential prehistoric deposits may be buried beneath alluvial deposits
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Havering AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project about 1.2 km away: Cory Decarbonisation Project; Radon affected area, class 2; Inside the Havering built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Havering - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Havering
Postcode
RM13 8EU
Received
6 Aug 2025
Validated
21 Aug 2025
Ward
Rainham & Wennington
Case officer
Show
Target decision
17 Oct 2025
Decision
Apprv with cons Conditions/Reasons
Decision date
17 Oct 2025
Applicant
Show

How this decision compares

Decided in 57 days from validation, 20 days faster than Havering's median of 77 for full applications. Approved, as 100% of full applications here are.

17%decided within 8 weeks
100%approved
769decided in the last year

Plota live figures for full applications decided by Havering in the last twelve months, from validation. Havering decision record →

Havering
Planning Authority Score
2.5/10
Poor
#251 of 296 overall
Relevant to this application:
Householder decisions

Havering is slower than most councils at deciding householder applications: #202 of 296 on speed. 47% of applications have the time limit extended, above the 41% national average. Havering is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

One of the strictest councils
only 83% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Havering decision statistics
Based on MHCLG data, the year to March 2026
74%
Overall approval rate
Below avg (87%) #290 of 296
83%
Householder approved
Below avg (90%) #262 of 296
56%
Decided in 8 weeks
Below avg (63%) #202 of 296
47%
Extended time limit
Above avg (41%) #207 of 296
42%
Minor dwellings approved
156 decided (1-9 homes)
83%
Major dwellings approved
12 decided (10+ homes)
29%
Change of use approved
101 decided
1,501
Total decisions
385 refused in the year to March 2026