University Centre Granta Place Cambridge Cambridgeshire CB2 1RU Data via plota.co.uk

25/04630/LBC - Listed Building Consent Approved

Proposal

Internal refurbishments and MEP upgrades on the ground floor and second floor of the University Centre Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Nov 2025
✓
Consultation
16 Dec 2025
✓
Approved
3 Feb 2026

Approved on 3 Feb 2026 · Delegated Decision · Last checked 8 Oct 2026

Site constraints 13

Grade II listed: Cambridge University Centre
List entry 1407952 · The pin is inside its outline · 33 more listed buildings within 150 m (3 Grade I, 1 Grade II*, 28 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 33 with distances
Historic England ↗
Historic Core conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Cambridge AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve 75 m away: Sheep's Green and Coe Fen
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Public footpath 26 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Also on the record
Registered park or garden 118 m away: Queens' College; Flood defence 23 m away (natural high ground, designed for a 1 in 50 year flood); Inside the Cambridge (Cambridge) built-up area; Green belt 22 m away: Cambridge; National infrastructure project 1544 m away: East West Rail - Bedford to Cambridge and Western improvements, at pre-application; Open access land 38 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
Listed Building Consent
Postcode
CB2 1RU
Received
28 Nov 2025
Validated
28 Nov 2025
Ward
Market
Case officer
Show
Target decision
3 Feb 2026
Decision
Granted Permission
Decision date
3 Feb 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Head of Estates

How this decision compares

Decided in 67 days from validation, 12 days slower than Cambridge's median of 55 for listed building works. Approved, as 97% of listed building works here are.

66%decided within 8 weeks
97%approved
146decided in the last year

Plota live figures for listed building works decided by Cambridge in the last twelve months, from validation. Cambridge decision record →

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Site or press notice
16 Dec 2025
Statutory expiry
23 Jan 2026
Env. assessment
No
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 councils
Relevant to this application:
Other decisions

Cambridge is one of the fastest councils in England for householder decisions, ranking #21 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026