Land At Garth Lane Grimsby North East Lincolnshire Data via plota.co.uk

DM/0554/26/FUL - Full Application Pending Consideration

Proposal

Variation of Condition 2 (Approved Plans) following to raise floor level and adjust external works surrounding apartment block to plots 42-61, amend rear paths to plots 99-103 and 35-36 and front paths/parking to plots 82-84, alter roof design for Denton and Oldbury house types to change dormers to rooflights Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Aug 2026
✓
Consultation
20 Aug 2026
Decision
Expected by 10 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 10 Nov 2026.

The consultation period closed on 20 Sept 2026.

Documents 17

All documents on the council site ↗

Associated applications 13

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
2 listed buildings within 150 m
Nearest: Haven Mill, Grade II, 44 m away · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Conservation area 22 m away: Central Grimsby
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Heritage at risk 22 m away: Central Area, Grimsby; Inside the Grimsby built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North East Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Received
11 Aug 2026
Validated
11 Aug 2026
Ward
West Marsh
Case officer
Show
Target decision
10 Nov 2026
Applicant
Show
Agent
Residential S72 Ltd

Public comments

No public comments yet.

184 neighbours consulted · Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15082589
Planning Portal ref
PP-15082589
Consultation
20 Aug 2026
Comments by
20 Sept 2026
Site or press notice
27 Aug 2026
Statutory expiry
10 Nov 2026
Env. assessment
No
North East Lincs
Planning Authority Score
5.3/10
Average
#132 of 296 councils
Relevant to this application:
Householder decisions

North East Lincs ranks #151 out of 296 councils for householder decision speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North East Lincs decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #22 of 296
97%
Householder approved
Above avg (90%) #35 of 296
64%
Decided in 8 weeks
Above avg (63%) #151 of 296
52%
Extended time limit
Above avg (41%) #235 of 296
95%
Minor dwellings approved
43 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
82%
Change of use approved
22 decided
467
Total decisions
24 refused in the year to March 2026