Church of Jesus Christ Latter Day Saints, St David's Park Spine Road, Ewloe CH5 3XP Data via plota.co.uk

FUL/000811/26 - Full - Building Works Republication period opened

Proposal

Demolition of the existing Church Stake Centre. Construction of a new Stake Centre with associated parking and landscaping. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Sept 2026
✓
Consultation
15 Oct 2026
Decision
Expected by 25 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision soon after comments close on 3 Dec 2026, from Flintshire's recent demolitions.

Comments are open until 3 Dec 2026

Comment on this application ↗

Documents 47

Plans & drawings 25

PDF ADD INFO 20.11.26 - Construction Vehicle Routes Plan - Redacted Additional Information · 20 Nov 2026 View ↗ PDF ADD INFO 20.10.26 - Travel Plan - Redacted Additional Information · 21 Oct 2026 View ↗ PDF Location Plan Location Plan View ↗ PDF Existing & Proposed Block Plan - Dwg 250615-0301 Plan View ↗ PDF Proposed Bin Store Plans & Elevations - Dwg 250615-0309 Plan View ↗ PDF Proposed Bike Store & Existing SIte Entrance Gate - Dwg 250615-0310 Plan View ↗ PDF Proposed Site Sections - Dwg 250615-0311-Rev P02 Plan View ↗ PDF Proposed Ground Floor Plan - Dwg 250615-0303- Rev P01 Plan View ↗ PDF Existing Site Layout - 250615-0202 Plan View ↗ PDF Proposed Elevations - Dwg 250615-0306- Rev P01 Elevation View ↗ PDF Proposed Site Plan - Dwg -250615-0302- Rev P03 Plan View ↗ PDF Existing Roof Plan - Dwg 250615-0205 Plan View ↗ PDF Existing Ground Floor Plan - Dwg 250615-0203 Plan View ↗ PDF Existing Sections - Dwg 250615-0211 Plan View ↗ PDF Existing Elevations - Dwg 250615-0206 Elevation View ↗ PDF Proposed Roof Plan - Dwg 250615-0305- Rev P01 Plan View ↗ PDF Proposed Ground Floor Plan - Dwg 250615-0303 - Rev P04 Plan View ↗ PDF Proposed Sections - DLA-2225-DLA-DR-L04 - Rev P06 Plan View ↗ PDF Existing Block Plan - Dwg DLA-2225-L05- Rev P08 Plan View ↗ PDF Tree Removal Plan - Dwg DLA 2225-L08- Rev P05 Plan View ↗ PDF Tree Protection Plan - Dwg DLA 2225-L-09- Rev P06 Plan View ↗ PDF Proposed Soft Landscape Propsals - DLA -2225- L03 - Rev P10 Plan View ↗ PDF Rights of Way Plan - Dwg DLA-2225-L12- Rev P03 Plan View ↗ PDF Proposed Hard Landscape Proposal - DLA-2225-L02-Rev P13 Plan View ↗ PDF Proposed Levels Layout - Dwg 304464-SWH-ZZ-XX-D-C-0056 P01 Plan View ↗

All documents on the council site ↗

Site constraints 20

Air Safeguarding Consult BAE Birdstrike HazardAir Safeguarding Consult BAE All developmentNoise Reduction TAN11 Noise Class 60.0-64.9Noise Reduction TAN11 Noise Class 65.0-69.9Noise Reduction TAN11 Noise Class 70.0-74.9Noise Reduction TAN11 Noise Class >=75.0Existing TrunkroadSafeguarding A494Proposed Road Safeguarding A55/A494 Ewloe to Northop Improvement SafeguardingNoise Reduction TAN11 Noise Class 55.0-59.9County Boundary Flintshire Unitary Authority County BoundaryWindfarm Consultation Area Consult National Air Traffic Services.Existing Waste Management Site Consult Environmental HealthAreas of Advertisement ControlDevelopment Control South TeamPublic right of wayFlood Map Surface and Water Courses Flood Zone 2Flood Map Surface and Water Courses Flood Zone 3
Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment. Nearest recorded mine shaft: 40 m away (reference 329366-250).
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
National infrastructure project 641 m away: HyNet Carbon Dioxide Pipeline
The site is 641 m from the project boundary. Pipeline, decided. The project page says whether consent was granted. Also within 2 km: Hynet North West Hydrogen Pipeline (at pre-application, 641 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Air Safeguarding Consult BAE Birdstrike HazardCouncil record
Recorded by the council for this site.
Council site ↗
Air Safeguarding Consult BAE All developmentCouncil record
Recorded by the council for this site.
Council site ↗
Noise Reduction TAN11 Noise Class 60.0-64.9Council record
Recorded by the council for this site.
Council site ↗
Noise Reduction TAN11 Noise Class 65.0-69.9Council record
Recorded by the council for this site.
Council site ↗
Noise Reduction TAN11 Noise Class 70.0-74.9Council record
Recorded by the council for this site.
Council site ↗
Noise Reduction TAN11 Noise Class >=75.0Council record
Recorded by the council for this site.
Council site ↗
Existing TrunkroadSafeguarding A494Council record
Recorded by the council for this site.
Council site ↗
Proposed Road Safeguarding A55/A494 Ewloe to Northop Improvement SafeguardingCouncil record
Recorded by the council for this site.
Council site ↗
Noise Reduction TAN11 Noise Class 55.0-59.9Council record
Recorded by the council for this site.
Council site ↗
County Boundary Flintshire Unitary Authority County BoundaryCouncil record
Recorded by the council for this site.
Council site ↗
Windfarm Consultation Area Consult National Air Traffic Services.Council record
Recorded by the council for this site.
Council site ↗
Existing Waste Management Site Consult Environmental HealthCouncil record
Recorded by the council for this site.
Council site ↗
Areas of Advertisement ControlCouncil record
Recorded by the council for this site.
Council site ↗
Development Control South TeamCouncil record
Recorded by the council for this site.
Council site ↗
Public right of wayCouncil record
Recorded by the council for this site.
Council site ↗
Flood Map Surface and Water Courses Flood Zone 2Council record
Recorded by the council for this site.
Council site ↗
Flood Map Surface and Water Courses Flood Zone 3Council record
Recorded by the council for this site.
Council site ↗
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Flintshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Flintshire
Application type
Full - Building Works
Postcode
CH5 3XP
Received
30 Sept 2026
Validated
30 Sept 2026
Ward
Flintshire Ward Ewloe
Parish
Flintshire Community Hawarden Community Council
Case officer
Show
Target decision
25 Nov 2026
Applicant
Show
Agent
The JTS Partnership LLP

Decision outlook

Day 54, past Flintshire's usual 52 days for demolitions. 86% are decided within thirteen weeks, so most likely by 30 Dec 2026.

Day 5411 days to the predicted decision (day 65)
74%decided within 8 weeks
88%approved
49decided in the last year

Plota live figures for demolitions decided by Flintshire in the last twelve months, from validation. Flintshire decision record →

Consultation & key dates

Alt. reference
PP-14579789
Comments by
3 Dec 2026
Site or press notice
7 Oct 2026