74 Osborne Road Acton W3 8SR Data via plota.co.uk

260671FUL - Full Application Refused

Proposal

Installation of an inpost parcel locker (Retrospective Application) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Feb 2026
✓
Validated
9 Mar 2026
✓
Consultation
10 Mar 2026
✗
Refused
5 May 2026
Appeal
Not lodged

Refused on 5 May 2026 · Delegated Decision · Last checked 7 Jul 2026

Licence at this address

  • Licence Londis Premises licence · in force since 2 Jan 2025 Licensed hours: alcohol until 23:00
    Food hygiene rating: 5 (Very good)Inspected 13 Jan 2025

Licensed hours are what the licence permits, not opening times.

Site constraints 6

Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 1046 m away: Thames Tideway Tunnel
The site is about 1046 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square; Conservation area about 99 m away: Mill Hill Park.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area118 m² (1,270 sq ft)
Energy ratingA (asset rating 18)
UseRetail/Financial and Professional Services
HeatingAir Conditioning

From the energy performance certificate lodged in July 2023, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Full Application
Postcode
W3 8SR
Received
16 Feb 2026
Validated
9 Mar 2026
Ward
South Acton
Case officer
Show
Target decision
4 May 2026
Decision
Refused
Decision date
5 May 2026
Decision level
Delegated Decision
Applicant
Show
Agent
NL Jones Planning
Leaseholder
Show

How this decision compares

Decided in 57 days from validation, 4 days faster than Ealing's median of 61 for utility and infrastructure works. Refused, as 12% of utility and infrastructure works here are.

42%decided within 8 weeks
88%approved
68decided in the last year

Plota live figures for utility and infrastructure works decided by Ealing in the last twelve months, from validation. Ealing decision record →

Consultation & key dates

Alt. reference
PP-14686001
Planning Portal ref
PP-14686001
Consultation
10 Mar 2026
Comments by
3 Apr 2026
Statutory expiry
4 May 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.