Pavement Outside 287 - 311 King Street London W6 9NH Data via plota.co.uk

2025/03583/FUL - Full Planning Application REGISTERED: Pending recommendation

Proposal

Installation of a new telephone kiosk on the pavement outside 311 King Street to replace the existing kiosk on the pavement outside 287 King Street. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
31 Dec 2025
✓
Validated
1 Jan 2026
Decision
Target date was 26 Feb 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 326.

The consultation period closed on 4 Feb 2026.

Documents 20

Plans & drawings 17

PDF Site Plan_amended_Pavement os 287-311 King St London W6 9NH Revised · 19 Aug 2026 View ↗ PDF EXISTING TELEPHONE KIOSK_ELEVATIONS Drawing · 31 Dec 2025 View ↗ PDF ELEVATION (REAR) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTING Drawing · 31 Dec 2025 View ↗ PDF ELEVATION (SIDE) - EXISTING_INCLUDED_IN_ELEVATION (FRONT) - EXISTING Drawing · 31 Dec 2025 View ↗ PDF LOCATION PLAN_PAVEMENT OUTSIDE 287-311 KING STREET LONDON W6 9NH Drawing · 31 Dec 2025 View ↗ PDF MANAGEMENT PLAN_2025 Drawing · 31 Dec 2025 View ↗ PDF NEW COMMUNICATIONS KIOSK_OVERVIEW AND SPECIFICATION_SEPT 2024 Drawing · 31 Dec 2025 View ↗ PDF PROPOSED NEW COMMUNICATIONS KIOSK_ELEVATIONS Drawing · 31 Dec 2025 View ↗ PDF ELEVATION (REAR) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSED Drawing · 31 Dec 2025 View ↗ PDF ELEVATION (SIDE) - PROPOSED_INCLUDED_IN_ELEVATION (FRONT) - PROPOSED Drawing · 31 Dec 2025 View ↗ PDF RF SAFETY COMPLIANCE CERTIFICATE_287-311 KING STREET Drawing · 31 Dec 2025 View ↗ PDF LAYOUT PLAN - EXISTING_INCLUDED_IN_BLOCK PLAN OF THE SITE Drawing · 31 Dec 2025 View ↗ PDF LAYOUT PLAN - PROPOSED_INCLUDED_IN_BLOCK PLAN OF THE SITE Drawing · 31 Dec 2025 View ↗ PDF SITEBLOCK PLAN - EXISTING_INCLUDED_IN_BLOCK PLAN OF THE SITE Drawing · 31 Dec 2025 View ↗ PDF MAPS SHOWING PROPOSED NEW COMMUNICATIONS KIOSK AND ASSOCIATED TELEPHONE KIOSK RE Drawing · 31 Dec 2025 View ↗ PDF CIL FORM_287-311 KING STREET Drawing · 31 Dec 2025 View ↗ PDF NOTICE 1_287-311 KING STREET Drawing · 31 Dec 2025 View ↗

All documents on the council site ↗

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Conservation area 25 m away: Westcroft Square; 1 listed building within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 4 (good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
W6 9NH
Received
31 Dec 2025
Validated
1 Jan 2026
Ward
Ravenscourt
Case officer
Show
Applicant
Show

Decision outlook

Day 326, past the statutory target. 59% of utility and infrastructure works in Hammersmith and Fulham are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 18 Nov 2026.

Day 326270 days past the 56-day target
31%decided within 8 weeks
98%approved
49decided in the last year

Plota live figures for utility and infrastructure works decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
7 Jan 2026
Comments by
4 Feb 2026
Site or press notice
14 Jan 2026
Statutory expiry
26 Feb 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 overall
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions: #281 of 296 on speed. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026