Cambridge On Ice Parkers Piece Parkside Cambridge Cambridgeshire Data via plota.co.uk
Proposal
Installation of ground-mounted electrical cabinets within Parkers Piece to support site infrastructure to include minor excavation, installation of the cabinets, and connection to existing services, with surrounding surfaces reinstated on completion. Data via plota.co.uk
Application progress
Approved on 1 Oct 2026 · Committee Decision (Area/Main) · Last checked 2 Oct 2026
Documents 26
Decision & officer reports 2
Statements & assessments 9
Application forms 2
Consultation & comments 8
Other documents 5
Site constraints 6
Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
25C City Road Cambridge Cambridgeshire CB1 1DP
Part single storey and part two storey rear/side extension, alterations to rear ...
21 Mill Street Cambridge Cambridgeshire CB1 2HP
Ash and Sycamore (G1) - re-pollard to previous pollard points with a finished he...
37A Clarendon Street Cambridge Cambridgeshire CB1 1JX
Construction of a first floor extension above existing single storey footprint.
The Emperor 21 Hills Road Cambridge Cambridgeshire CB2 1NW
Submission of details required by conditions 5 (Traffic Management Plan) and 6 (...
21 St Barnabas Road Cambridge Cambridgeshire CB1 2BU
T1 lime tree, to re-pollard by removing 4m of new growth from the height of the ...
37 St Barnabas Road Cambridge Cambridgeshire CB1 2BX
Replacement of the rear dormer window. Replacement of the roof light above the s...
Important details
How this decision compares
Decided in 120 days from validation, 65 days slower than Cambridge's median of 55 for utility and infrastructure works. Approved, as 93% of utility and infrastructure works here are.
Plota live figures for utility and infrastructure works decided by Cambridge in the last twelve months, from validation. Cambridge decision record →
Public comments
363 neighbours consulted · Last counted 2 Oct 2026
Consultation & key dates
- Site or press notice
- 16 Jun 2026
- Committee
- 24 Sept 2026
- Statutory expiry
- 29 Jul 2026
- Env. assessment
- No
Historical activity at this location
4 nearby applications on record - archival context, not part of the live application.
Nearby activity
Cambridge is one of the fastest councils in England for householder decisions: #21 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).
Track this application
Cambridge On Ice Parkers Piece Parkside Cambridge Cambridgeshire
Tracking this application
Not there after a minute? Check your junk folder. It's from alerts@plota.co.uk.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
