Trinity School, SCHOOL SITE Heathway, Dagenham, Barking And Dagenham, RM10 7SJ Data via plota.co.uk

Proposal

Demolition of The Heathway Centre building and two adjoining demountable buildings and construction of a replacement specialist Living and Learning Centre; construction of secondary vehicle access onto the A1240 Heathway to provide a drop-off and pick-up facility; creation of additional car parking; construction of a ground floor extension to existing/retained Staff Training Centre including recladding existing elevations; associated hard and soft landscaping. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Jun 2025
✓
Approved
11 Sept 2025

Approved on 11 Sept 2025 · Last checked 1 Oct 2026

Documents 66

Statements & assessments 32

PDF Arboricultural Method Statement Other · 24 Jun 2025 View ↗ PDF Arboricultural Impact Assessment Other · 24 Jun 2025 View ↗ PDF Proposed Parking Amendments Plan (on-street) Transport Assessment / Statement · 20 Jun 2025 View ↗ PDF Swept Path Diagrams (Appended to Transport Assessment) Transport Assessment / Statement · 20 Jun 2025 View ↗ PDF Statutory Biodiversity Metric Biodiversity / Habitat Report · 12 Jun 2025 View ↗ PDF BNG Assessment Biodiversity / Habitat Report · 12 Jun 2025 View ↗ PDF (Superseded) Arboricultural Method Statement Other · 3 Jun 2025 View ↗ PDF (Superseded) Arboricultural Impact Assessment Other · 3 Jun 2025 View ↗ PDF Air Quality Assessment Other · 3 Jun 2025 View ↗ PDF Planning Statement Planning Statement · 3 Jun 2025 View ↗ PDF As Designed Energy Assessment Energy / Sustainability Assessment · 3 Jun 2025 View ↗ PDF Phase 1 Flood Risk & SuDS Statement 3/3 Flood Risk Assessment · 3 Jun 2025 View ↗ PDF Phase 1 Flood Risk & SuDS Statement 2/3 Flood Risk Assessment · 3 Jun 2025 View ↗ PDF Phase 1 Flood Risk & SuDS Statement 1/3 Flood Risk Assessment · 3 Jun 2025 View ↗ PDF Design and Access Statement (4/4) Design and Access Statement · 3 Jun 2025 View ↗ PDF Design and Access Statement (3/4) Design and Access Statement · 3 Jun 2025 View ↗ PDF Design and Access Statement (2/4) Design and Access Statement · 3 Jun 2025 View ↗ PDF Design and Access Statement (1/4) Design and Access Statement · 3 Jun 2025 View ↗ PDF Transport Assessment Addendum Transport Assessment / Statement · 3 Jun 2025 View ↗ PDF BREEAM Travel Plan Transport Assessment / Statement · 3 Jun 2025 View ↗ PDF Noise Impact Assessment Noise/Acoustic Assessment · 3 Jun 2025 View ↗ PDF Fire Statement Other · 3 Jun 2025 View ↗ PDF Bat Emergence Survey Results v3 Biodiversity / Habitat Report · 3 Jun 2025 View ↗ PDF Bat Emergence Survey Results v2 Biodiversity / Habitat Report · 3 Jun 2025 View ↗ PDF Bat Emergence Survey Results v1 Biodiversity / Habitat Report · 3 Jun 2025 View ↗ PDF Ecological Appraisal Biodiversity / Habitat Report · 3 Jun 2025 View ↗ PDF BREEAM Statement Energy / Sustainability Assessment · 3 Jun 2025 View ↗ PDF WSI Archaeological assessment Other · 3 Jun 2025 View ↗ PDF Archaeological Desk Based Assessment Other · 3 Jun 2025 View ↗ PDF Land Contamination Desk Study Land Contamination Assessment · 3 Jun 2025 View ↗ PDF Daylighting Assessment Report Daylight / Sunlight Assessment · 3 Jun 2025 View ↗ PDF (Superseded) Arboricultural Impact Assessment Other · 3 Jun 2025 View ↗

Plans & drawings 27

PDF LLC Proposed Roof Plan Plans / Drawings · 24 Jun 2025 View ↗ PDF Urban Greening Factor Plan Plans / Drawings · 20 Jun 2025 View ↗ PDF Landscape Masterplan Plans / Drawings · 20 Jun 2025 View ↗ PDF Boundary Treatment Plan Plans / Drawings · 20 Jun 2025 View ↗ PDF Future Provision Plan Plans / Drawings · 20 Jun 2025 View ↗ PDF Parking Provision Plan Plans / Drawings · 20 Jun 2025 View ↗ PDF Living & Learning Centre Landscape Plan Plans / Drawings · 20 Jun 2025 View ↗ PDF Green Infrastructure Plan Plans / Drawings · 20 Jun 2025 View ↗ PDF Landscape Masterplan Levels Plans / Drawings · 20 Jun 2025 View ↗ PDF STC Existing and Proposed Elevations Plans / Drawings · 3 Jun 2025 View ↗ PDF STC Existing and Proposed Roof Plan Plans / Drawings · 3 Jun 2025 View ↗ PDF STC Existing and Proposed Ground Floor Plan Plans / Drawings · 3 Jun 2025 View ↗ PDF LLC Proposed Sections Plans / Drawings · 3 Jun 2025 View ↗ PDF LLC Proposed Elevations Plans / Drawings · 3 Jun 2025 View ↗ PDF (Superseded) LLC Proposed Roof Plan Plans / Drawings · 3 Jun 2025 View ↗ PDF LLC Proposed Ground Floor Plan Plans / Drawings · 3 Jun 2025 View ↗ PDF Environmental Management Plan Other · 3 Jun 2025 View ↗ PDF Construction Logistics Plan Construction Management / Logistics Plan · 3 Jun 2025 View ↗ PDF (Superseded) Future Provision Plans / Drawings · 3 Jun 2025 View ↗ PDF (Superseded) Living Learning Centre Plans / Drawings · 3 Jun 2025 View ↗ PDF (Superseded) Parking Provision Plans / Drawings · 3 Jun 2025 View ↗ PDF (Superseded) Green Infrastructure Plan Plans / Drawings · 3 Jun 2025 View ↗ PDF (Superseded) Urban Greening Factor Plans / Drawings · 3 Jun 2025 View ↗ PDF Existing Site Plan Plans / Drawings · 3 Jun 2025 View ↗ PDF Site Security Plan Plans / Drawings · 3 Jun 2025 View ↗ PDF (Superseded) Landscape Masterplan Plans / Drawings · 3 Jun 2025 View ↗ PDF Site Location Plan Site Location Plan · 3 Jun 2025 View ↗

All documents on the council site ↗

Associated applications 6

Site constraints 3

Article 4 direction
HMO Article 4. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Barking and Dagenham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Barking and Dagenham built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Barking and Dagenham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
RM10 7SJ
Received
2 Jun 2025
Validated
2 Jun 2025
Ward
Heath
Case officer
Show
Target decision
11 Sept 2025
Decision
Approved Subject To Legal Agreement
Decision date
11 Sept 2025
Applicant
Show
Agent
RENEW Planning Limited

How this decision compares

Decided in 101 days from validation, 46 days slower than Barking and Dagenham's median of 55 for demolitions. Approved, as 67% of demolitions here are.

69%decided within 8 weeks
67%approved
132decided in the last year

Plota live figures for demolitions decided by Barking and Dagenham in the last twelve months, from validation. Barking and Dagenham decision record →

Consultation & key dates

Statutory expiry
11 Sept 2025
Barking and Dagenham
Planning Authority Score
6.4/10
Average
#81 of 296 councils
Relevant to this application:
Householder decisions

Barking and Dagenham is one of the fastest councils in England for householder decisions, ranking #9 out of 296. Only 16% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Barking and Dagenham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 68% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Barking and Dagenham decision statistics
Based on MHCLG data, the year to March 2026
64%
Overall approval rate
Below avg (87%) #296 of 296
68%
Householder approved
Below avg (90%) #296 of 296
93%
Decided in 8 weeks
Above avg (63%) #9 of 296
16%
Extended time limit
Below avg (41%) #13 of 296
43%
Minor dwellings approved
86 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
28%
Change of use approved
80 decided
725
Total decisions
260 refused in the year to March 2026