25/01004/PRIPV - Prior Approval Approved

Proposal

Installation of Solar PV panels east and west facing on the roof with the following proposed system: 350 kwp (max 875 panels) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Jul 2025
✓
Approved
28 Aug 2025

Approved on 28 Aug 2025 · Last checked 18 Oct 2026

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
HMO Article 4. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Strategic industrial land
Reserved for industry and logistics.
The London Plan protects strategic industrial locations from other uses; release needs a plan-led process.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Barking and Dagenham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve 75 m away: Scrattons Ecopark Amd Extension
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 897 m away: London Strategic Heat Main Project, at pre-application; Inside the Barking and Dagenham built-up area; Public transport access: PTAL 1b (very poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Barking and Dagenham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Prior Approval
Postcode
RM9 6RS
Received
9 Jul 2025
Validated
9 Jul 2025
Ward
Barking Riverside
Case officer
Show
Target decision
3 Sept 2025
Decision
Prior Approval Not Required
Decision date
28 Aug 2025
Applicant
Show
Agent
Syzygy Renewables

How this decision compares

Decided in 50 days from validation, 6 days faster than Barking and Dagenham's median of 56 for commercial premises. Approved, as 79% of commercial premises here are.

51%decided within 8 weeks
79%approved
133decided in the last year

Plota live figures for commercial premises decided by Barking and Dagenham in the last twelve months, from validation. Barking and Dagenham decision record →

Consultation & key dates

Statutory expiry
3 Sept 2025
Barking and Dagenham
Planning Authority Score
6.4/10
Average
#81 of 296 overall
Relevant to this application:
Householder decisions

Barking and Dagenham is one of the fastest councils in England for householder decisions: #9 of 296 on speed. Only 16% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Barking and Dagenham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 68% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Barking and Dagenham decision statistics
Based on MHCLG data, the year to March 2026
64%
Overall approval rate
Below avg (87%) #296 of 296
68%
Householder approved
Below avg (90%) #296 of 296
93%
Decided in 8 weeks
Above avg (63%) #9 of 296
16%
Extended time limit
Below avg (41%) #13 of 296
43%
Minor dwellings approved
86 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
28%
Change of use approved
80 decided
725
Total decisions
260 refused in the year to March 2026