142 Longbridge Road, Barking, Barking And Dagenham, IG11 8SN Data via plota.co.uk

25/01642/FULL - Full Planning Permission Approved at committee

Approved at planning committee on 10 March 2026. The council has not issued its decision notice yet.

Proposal

Change of use of the dwelling (Use Class C3) to a multi-purpose community facility (Use Class F2(b)) and a place of worship (Use Class F1(f)) with associated cycle parking and refuse storage and addition of an entrance door to the side elevation Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Nov 2025
✓
Validated
3 Dec 2025
✓
Committee
10 Mar 2026
Decision notice
Not issued yet

Under consideration

No decision has been issued yet. Plota predicted a decision around 18 Nov 2026; it is now day 350.

Planning committee

Decided by Barking and Dagenham Planning Committee on 10 Mar 2026. The council has not yet issued its decision notice.

Approved

As officers recommended.

  • Officers advised approval because community need outweighed the loss of a family-sized dwelling, subject to mitigation and a legal agreement.
  • Residents raised concerns about parking, traffic, noise, disturbance, privacy, overdevelopment and the loss of a home; others supported community benefits.
  • The committee approved the application in principle, subject to a section 106 agreement, conditions and delegated authority if the agreement was delayed.
Read how the committee decided The proposal, site history, officers’ assessment, public views, committee discussion and decision.

Source: Plota analysis of Barking and Dagenham's committee minutes of 10 Mar 2026.

Documents 34

All documents on the council site ↗

Site constraints 6

Article 4 direction
HMO Article 4. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Air quality management area: Barking and Dagenham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Barking and Dagenham built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Metropolitan Open Land 50 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area429 m² (4,618 sq ft)
Energy ratingD (57 out of 100), could reach C
PropertyDetached house, 7 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in March 2021, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Barking and Dagenham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
IG11 8SN
Received
14 Nov 2025
Validated
3 Dec 2025
Ward
Longbridge
Case officer
Show
Target decision
7 Aug 2026
Applicant
Show
Agent
Cityscape PTA

Decision outlook

Day 350, past the statutory target. 92% of changes of use in Barking and Dagenham are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 17 Nov 2026.

Day 350294 days past the 56-day target
64%decided within 8 weeks
53%approved
177decided in the last year

Plota live figures for changes of use decided by Barking and Dagenham in the last twelve months, from validation. Barking and Dagenham decision record →

Consultation & key dates

Statutory expiry
7 Aug 2026
Barking and Dagenham
Planning Authority Score
6.4/10
Average
#81 of 296 councils
Relevant to this application:
Change of use

Barking and Dagenham is one of the fastest councils in England for householder decisions, ranking #9 out of 296. Only 16% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Barking and Dagenham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 68% approved vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Barking and Dagenham decision statistics
Based on MHCLG data, the year to March 2026
64%
Overall approval rate
Below avg (87%) #296 of 296
68%
Householder approved
Below avg (90%) #296 of 296
93%
Decided in 8 weeks
Above avg (63%) #9 of 296
16%
Extended time limit
Below avg (41%) #13 of 296
43%
Minor dwellings approved
86 decided (1-9 homes)
100%
Major dwellings approved
7 decided (10+ homes)
28%
Change of use approved
80 decided
725
Total decisions
260 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.