Lannhall Tynron Thornhill DG3 4LB Data via plota.co.uk

26/0964/FUL - Full Application Approved

Proposal

Relocation of gate piers and erection of replacement railings and gates (partially retrospective) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Jun 2026
✓
Validated
3 Jun 2026
✓
Approved
4 Aug 2026

Approved on 4 Aug 2026 · Delegated · Last checked 4 Aug 2026

Site constraints 2

2 listed buildings within 150 m of the postcode pin
Nearest: Lannhall, Grade B, about 2 m from the postcode pin · 1 Grade B, 1 Grade C
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic Environment Scotland ↗
Also on the record
Radon affected area, class 2.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dumfries - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dumfries
Application type
Full Application
Postcode
DG3 4LB
Received
2 Jun 2026
Validated
3 Jun 2026
Ward
Mid And Upper Nithsdale
Parish
Tynron Community Council
Case officer
Show
Decision
Grant Unconditionally
Decision date
4 Aug 2026
Decision level
Delegated
Applicant
Show
Agent
McGowan Miller Construction Consultants

How this decision compares

Decided in 62 days from validation, 12 days slower than Dumfries's median of 50 for extensions. Approved, as 95% of extensions here are.

70%decided within 8 weeks
95%approved
365decided in the last year

Plota live figures for extensions decided by Dumfries in the last twelve months, from validation. Dumfries decision record →

Public comments

No public comments yet.

Last counted 4 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
100756489-001
Comments by
4 Aug 2026
Env. assessment
No