Niketown 236 Oxford Street London W1C 1DE Data via plota.co.uk

26/03565/LBC - Listed Building Consent Application Approved

Proposal

Internal alterations at ground, first, second and third floor level. Data via plota.co.uk

View original council record ↗

Application progress

Received
1 Jun 2026
Validated
17 Jun 2026
Approved
1 Jul 2026

Approved on 1 Jul 2026 · Delegated Decision · Last checked 7 Jul 2026

Documents 67

Plans & drawings 49

PDF LEVEL 1 SPRINKLER PIPE LAYOUT SHEET 1* Drawing · 19 Jun 2026 View ↗ PDF LEVEL 1 SPRINKLER PIPE LAYOUT SHEET 2* Drawing · 19 Jun 2026 View ↗ PDF GROUND FLOOR MEZZ SW MECHANICAL PIPEWORK LAYOUT SHEET 3 OF 4 Drawing · 1 Jun 2026 View ↗ PDF PUBLIC HEALTH SERVICES WATER SERVICES LAYOUT LEVEL 02 Drawing · 1 Jun 2026 View ↗ PDF PUBLIC HEALTH SERVICES WATER SERVICES LAYOUT LEVEL 03 Drawing · 1 Jun 2026 View ↗ PDF PUBLIC HEALTH SERVICES WATER SERVICES SCHEMATIC Drawing · 1 Jun 2026 View ↗ PDF PUBLIC HEALTH SERVICES WATER SERVICES LAYOUT GROUND FLOOR Drawing · 1 Jun 2026 View ↗ PDF PUBLIC HEALTH SERVICES WATER SERVICES LAYOUT LEVEL 01 Drawing · 1 Jun 2026 View ↗ PDF ESCALATOR SECONDARY STEELWORK DETAILS Drawing · 1 Jun 2026 View ↗ PDF ENTRANCE SCREEN STEELWORK DETAILS Drawing · 1 Jun 2026 View ↗ PDF ESCALATOR SECONDARY STEELWORK Drawing · 1 Jun 2026 View ↗ PDF HEATING AND COOLING L3 Drawing · 1 Jun 2026 View ↗ PDF VENTILATION L3 Drawing · 1 Jun 2026 View ↗ PDF HEATING AND COOLING GROUND FLOOR Drawing · 1 Jun 2026 View ↗ PDF VENTILATION GROUND FLOOR Drawing · 1 Jun 2026 View ↗ PDF HEATING AND COOLING L1 Drawing · 1 Jun 2026 View ↗ PDF MECHANICAL SERVICES VENTILATION LAYOUT LEVEL 01 Drawing · 1 Jun 2026 View ↗ PDF HEATING AND COOLING L2 Drawing · 1 Jun 2026 View ↗ PDF VENTILATION L2 Drawing · 1 Jun 2026 View ↗ PDF ICT SERVICES ICT & DATA LEVEL 02 Drawing · 1 Jun 2026 View ↗ PDF AUDIO SYSTEMS L2 Drawing · 1 Jun 2026 View ↗ PDF ICT SERVICES ICT & DATA LEVEL 03 Drawing · 1 Jun 2026 View ↗ PDF AUDIO SYSTEMS L3 Drawing · 1 Jun 2026 View ↗ PDF ICT SERVICES ICT & DATA GROUND FLOOR Drawing · 1 Jun 2026 View ↗ PDF AUDIO SYSTEMS GROUND FLOOR Drawing · 1 Jun 2026 View ↗ PDF ICT SERVICES ICT & DATA LEVEL 01 Drawing · 1 Jun 2026 View ↗ PDF AUDIO SYSTEMS L1 Drawing · 1 Jun 2026 View ↗ PDF LEVEL 2 SPRINKLER PROTECTION LAYOUT - SHEET 1 Drawing · 1 Jun 2026 View ↗ PDF LEVEL 2 SPRINKLER PROTECTION LAYOUT - SHEET 2 Drawing · 1 Jun 2026 View ↗ PDF LEVEL 3 SPRINKLER PIPEWORK LAYOUT - SHEET 1 Drawing · 1 Jun 2026 View ↗ PDF LEVEL 0 SPRINKLER PIPEWORK LAYOUT - SHEET 1 Drawing · 1 Jun 2026 View ↗ PDF LEVEL 0 SPRINKLER HEAD LAYOUT - SHEET 2 Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES PAVA, FIRE ALARM & EMERGENCY LIGHTING LAYOUT LEVEL 02 Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES PAVA, FIRE ALARM & EMERGENCY LIGHTING LAYOUT LEVEL 03 Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES PAVA, FIRE ALARM & EMERGENCY LIGHTING LAYOUT GROUND FLOOR Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES PAVA, FIRE ALARM & EMERGENCY LIGHTING LAYOUT LEVEL 01 Drawing · 1 Jun 2026 View ↗ PDF ELECTRIC SERVICES SMALL POWER LAYOUT GROUND FLOOR Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES SMALL POWER LAYOUT LEVEL 01 Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES SMALL POWER LAYOUT LEVEL 02 Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES SMALL POWER LAYOUT LEVEL 03 Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES ELECTRICAL DISTRIBUTION STRATEGY LOW LEVEL Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES ELECTRICAL DISTRIBUTION STRATEGY Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL DISTRIBUTION STRATEGY HIGH LEVEL GROUND FLOOR Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES ELECTRICAL DISTRIBUTION STRATEGY HIGH LEVEL LEVEL 03 Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES ELECTRICAL DISTRIBUTION STRATEGY LOW LEVEL GROUND FLOOR Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES ELECTRICAL DISTRIBUTION STRATEGY LOW LEVEL LEVEL 03 Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES ELECTRICAL DISTRIBUTION STRATEGY HIGH LEVEL Drawing · 1 Jun 2026 View ↗ PDF ELECTRICAL SERVICES ELECTRICAL DISTRIBUTION STRATEGY HIGH LEVEL LEVEL 02 Drawing · 1 Jun 2026 View ↗ PDF LOCATION PLAN Location Plan · 1 Jun 2026 View ↗

All documents on the council site ↗

Work with planning data? Every application in Westminster - and every UK council - as a live feed or API. About Plota's data service

Important details

Application type
Listed Building Consent Application
Postcode
W1C 1DE
Received
1 Jun 2026
Validated
17 Jun 2026
Ward
West End
Case officer
Show
Target decision
12 Aug 2026
Decision
Application Permitted
Decision date
1 Jul 2026
Decision level
Delegated Decision
Agent
Montagu Evans LLP

Consultation & key dates

Alt. reference
PP-14943613
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Other decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision performance
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026