105 Bannerdale Road Sheffield S7 2DQ Data via plota.co.uk

26/01546/FUL - Full Planning Application Awaiting decision

Proposal

Alterations and extension to attic to form additional habitable space including erection of rear dormer, erection of two-storey side extension and single-storey rear extension to dwellinghouse Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 May 2026
✓
Validated
1 Jun 2026
Decision
Expected by 4 Sept 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 130.

Site constraints 5

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Sheffield Citywide AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Radon affected area, class 4; Coalfield, development low risk area; Inside the Sheffield built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area90 m² (969 sq ft)
Energy ratingD (63 out of 100), could reach C
PropertySemi-detached house, 5 habitable rooms
Built1967 to 1975
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in September 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Sheffield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sheffield
Application type
Full Planning Application
Postcode
S7 2DQ
Received
26 May 2026
Validated
1 Jun 2026
Ward
Ecclesall
Case officer
Show
Target decision
4 Sept 2026
Applicant
Show
Agent
YS Design Services Ltd

Decision outlook

Day 130, past the statutory target. 92% of extensions in Sheffield are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 13074 days past the 56-day target
68%decided within 8 weeks
89%approved
903decided in the last year

Plota live figures for extensions decided by Sheffield in the last twelve months, from validation. Sheffield decision record →

Public comments

1comment received
1 neutral

7 neighbours consulted · Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14958305
Planning Portal ref
PP-14958305
Statutory expiry
27 Jul 2026
Env. assessment
No
Sheffield
Planning Authority Score
4.4/10
Below average
#183 of 296 councils
Relevant to this application:
Householder decisions

Sheffield ranks #176 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Sheffield decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #178 of 296
89%
Householder approved
Below avg (90%) #209 of 296
61%
Decided in 8 weeks
Below avg (63%) #176 of 296
36%
Extended time limit
Below avg (41%) #114 of 296
71%
Minor dwellings approved
144 decided (1-9 homes)
85%
Major dwellings approved
33 decided (10+ homes)
87%
Change of use approved
124 decided
1,756
Total decisions
237 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.