Application progress

✓
Received
around 1 Jun 2026
✓
Approved
24 Jul 2026

Approved on 24 Jul 2026 · Delegated decision · Last checked 28 Jul 2026

Site constraints 6

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Air quality management area: Newham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 417 m away: Thames Tideway Tunnel
The site is 417 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Inside the Newham built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Newham
Application type
Full Planning Permission
Postcode
E15 3ET
Received
around 1 Jun 2026
Validated
1 Jun 2026
Ward
West Ham
Parish
Stratford Community Forum
Case officer
Show
Decision
Approve
Decision date
24 Jul 2026
Decision level
Delegated decision
Applicant
Show

How this decision compares

Decided in 53 days from validation, about the council's usual 55 days. Approved, as 90% of signs and adverts here are.

73%decided within 8 weeks
90%approved
108decided in the last year

Plota live figures for signs and adverts decided by Newham in the last twelve months, from validation. Newham decision record →

Consultation & key dates

Env. assessment
No
Newham
Planning Authority Score
3.7/10
Below average
#211 of 296 councils
Relevant to this application:
Householder decisions

Newham ranks #191 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Newham decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #239 of 296
87%
Householder approved
Below avg (90%) #233 of 296
59%
Decided in 8 weeks
Below avg (63%) #191 of 296
39%
Extended time limit
Below avg (41%) #140 of 296
51%
Minor dwellings approved
67 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
59%
Change of use approved
51 decided
989
Total decisions