SEND education facility at Land At Chipley Mill, Bickington
Summary of planning committee decision
Decided by Teignbridge Planning Committee on 22 Sept 2026.
The site and its history
The site is a rural school campus beside the River Lemon, mostly within Flood Zone 3b, and has operated as an educational facility since 2018.
“DESCRIPTION Site Description 3.1 The application site forms part of The Greater Horseshoe School and is known as the Chipley Mill site. The Greater Horseshoe School is an independent specialist school registered with Ofsted to provide education for up to 50 children and young people aged between 8 and 18 years with a range of special educational needs and developmental challenges.”
“Existing built development on the site includes two barn structures located close to the minor road along the western boundary, one of which is subdivided into several sections and utilised by the school. A parking area is located within the south-western corner of the site, and a number of smaller ancillary structures have been erected to the east of the main barns. Vehicular access to the site is gained directly from the adjacent minor road near its junction with the A383.”
Officer report
What officers advised
Officers recommended refusal because the educational use is incompatible with Flood Zone 3b and ecological information is insufficient to assess biodiversity effects.
“RECOMMENDATION Planning Permission be REFUSED for the following reasons: 1. The application site lies within Flood Zone 3b (Functional Floodplain). The proposed use constitutes an educational establishment which is classified as More Vulnerable development for the purposes of national flood risk policy.”
“In the absence of an Ecological Impact Assessment, protected species surveys, sufficient information to inform a Habitats Regulations Assessment, and details of any necessary mitigation, compensation or enhancement measures, the Local Planning Authority cannot conclude that the development would avoid unacceptable harm to biodiversity interests or that there would be no adverse effect on the integrity of the South Hams Special Area of Conservation.”
Officer report
What consultees said
The Environment Agency and biodiversity officer objected, while highways, trees and surface-water drainage consultees raised no in-principle objection.
“Devon County Council Lead Local Flood Authority • Raises no in-principle objection to the proposal from a surface water drainage perspective. • Advises that the applicant should assess the condition of any existing drainage infrastructure or install a filter drain/filter strip if no surface water drainage system currently exists.”
“Requests confirmation of future maintenance responsibilities for the site's drainage system to ensure its ongoing operation in perpetuity. Devon County Council Highways • Raises no objection to the application and confirms that its position remains unchanged from the previous application. • Considers the existing access arrangements to be adequate in terms of geometry and visibility to safely accommodate the traffic generated by the development.”
Officer report
What people said
Supporters described important specialist educational and therapeutic benefits, while objectors raised flooding, biodiversity, planning, amenity, traffic and countryside concerns.
“Supporters consider the site to be professionally managed and note that flood risk is actively monitored through established site management procedures. • A number of representations refer to the wider shortage of specialist SEND placements and the importance of retaining established educational provision.”
“Concerns regarding impacts on biodiversity, including potential effects on bats, the South Hams SAC Landscape Connectivity Zone and other protected species. • Concerns regarding noise, disturbance and the impact of the use on the living conditions of nearby residents. • Concerns regarding traffic generation, highway safety, staff vehicle movements and the suitability of the access arrangements.”
Officer report
Who spoke
A head teacher and a clinical lead or occupational therapist spoke in support, describing the facility’s benefits, demand and flood management.
What councillors debated
Councillors discussed the facility’s benefits, flood history and safety measures, while officers emphasised the Environment Agency’s continuing objection and potential risk to life.
“The site has yet to be subject to a flood. • There is a low risk of surface water flooding. • The applicant’s flood risk management plans are adequate. • The site was not affected by the rain during the early months of 2026. • The applicant’s daily flood monitoring ensures closure if it is at risk of flooding. • The facility has been rated ‘outstanding’ by OFFSTED.”
“The Head of Development Management reflected that the Meeting had heard the benefits of the facility but emphasised that given the objection from the EA the Councillors were dealing with a potential risk to life. He reiterated that the site lies within Flood Zone 3b (functional floodplain), and the Environment Agency (EA) has maintained an objection to the proposal and current application.”
Minutes
The committee’s decision
The committee resolved to refer its intention to grant permission to the Secretary of State, subject to restrictions and conditions, contrary to officer advice.
“Note: The Committee’s decision of an intention to approve the application is contrary to officer advice. The Committee considered the application acceptable because it was considered the benefits of the facility, along with the school’s measures to reduce flood risk outweighed the recommended reasons for refusal set out on the agenda report…”
Minutes
The members' reasons
The resolution gives these reasons:
“On flood risk grounds. The intention to grant permission is subject to the following conditions: Restriction of use 1. Restriction of use to satellite education facility tied to the greater horseshoe school 2. Maximum number of pupils restrictions 3. Restricting hours of use to the school day 4. Removal of pd rights relevant to schools – restriction of further buildings normally allowed by PD Biodiversity 1. Ecology – Within six months of the date of this permission an Ecological Impact Assessment and Landsca”
Minutes
Source: the council's minutes, quoted word for word.
Councillors at the meeting
- Linda Goodman-BradburyChairVice-Chair, in the chairLib Dem
- Janet BradfordIndependent
- Phil BullivantConservative
- Alex HallConservative
- Stephen HornerReform UK
- David PalethorpeLib Dem
- Kevin SmithLib Dem
- Peter WilliamsLib Dem
- Andrew MacGregorSubstituteIndependent
Apologies David Cox Lib Dem, Paul Parker Independent, Suzanne Sanders Lib Dem
Also attending Chris Clarance Independent, John Nutley Lib Dem, Stuart Rogers Conservative, Gary Taylor Lib Dem
Source: Plota analysis of the council's minutes; parties from the council's list of councillors.
Sources
- Teignbridge Planning Committee minutes, 22 September 2026
- Agenda and papers (council website)
Source: Plota analysis of Teignbridge's committee minutes and officer report. Quotations are the council's own words; headings and summaries are Plota's.
Committee decisions and nationwide planning applications, in one API
The Plota API returns planning applications from every council we cover, each with its decision, whether a committee or officers decided it, and the committee date. Build it into your own tools.
See the API →At the meeting
- Committee
- Teignbridge Planning Committee
- Council
- Teignbridge
- Date
- Tuesday 22 September 2026
- Recommendation
- Officers recommended refusal
- Committee decided
- Approved, against officer advice
- Councillors
- 9Lib Dem 4Conservative 2Independent 2Reform UK 1Show councillors
- Minutes
- The council's minutes
- Meeting
- Agenda and papers (council website)
- Application
- View application →
- All decisions
- Teignbridge committee decisions →
This committee's year
11 decisions in the 12 months to this meeting, 1 against officer advice.
Source: Plota analysis of the committee's minutes.