Coleshill Manor Campus South Drive Coleshill B46 1DL

Pending 2026/0372/DOC - Major Development
Date received
12 May 2026
Date validated
12 May 2026
Postcode
B46 1DL
Type
Major Development

Description

Application to Discharge Condition(s) 6 (surface water drainge, in-part), Part 7 (foul water drainage, in-part), 10 (Construction Management Plan), 11 (Construction Environmental Management Statement), 12 (Landscape and Ecological Management Plan) of Planning Permission PAP/2024/0575 dated 16 May 2025 for "Variation of planning conditions 2, 3, 4, 5, 6, 7, 8, 10, 11, 12, 13, 14, 17 and 20 attached to planning permission PAP/2019/0701 dated 11 August 2020 [which grants full planning permission for the erection and operation of a landmark structure, with associated visitor centre and public open space (D2), together with ancillary essential development including dedicated car parking, landscaping, access road and services provisions (mixed use including D1, A1, A3, A4 and B1 facilities) to operate as a national memorial and to create a significant public art architectural feature] to reflect design amendments to scheme and associated works"

North Warwickshire
Planning Authority Score
4.9/10
Below average
#156 of 292 councils
Relevant to this application:
Major dwellings

North Warwickshire ranks #181 out of 292 councils for householder decision speed. 52% of applications have the time limit extended, above the 40% national average. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Warwickshire decision performance
Based on MHCLG data, 2025
93%
Overall approval rate
Above avg (87%) #65 of 292
97%
Householder approved
Above avg (90%) #32 of 292
60%
Decided in 8 weeks
Below avg (64%) #181 of 292
52%
Extended time limit
Above avg (40%) #235 of 292
83%
Minor dwellings approved
64 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
81%
Change of use approved
21 decided
375
Total decisions
25 refused in 2025