Evergreens Miniature Railway East Keal Bank East Keal Lincolnshire PE23 4AE Data via plota.co.uk

00864/26/ESR - EIA - Screening Option Approved

Proposal

Environmental Impact Assessment (E.E.C. Directive .E.C. as amended by Council Directive .C.) for a screening opinion with respect to the change of use of land for the siting of a miniature railway and erection of associated railway buildings (amended scheme from original approval ). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 May 2026
✓
Approved
15 Jun 2026

Approved on 15 Jun 2026 · Delegated Decision · Last checked 5 Jul 2026

Associated applications 3

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
National infrastructure project 334 m away: Grimsby to Walpole, at pre-application.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
EIA - Screening Option
Postcode
PE23 4AE
Received
27 May 2026
Validated
27 May 2026
Ward
Halton Holegate Ward
Parish
East Keal
Case officer
Show
Target decision
16 Jun 2026
Decision
Not required
Decision date
15 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Dieter Nelson Planning Consultancy

How this decision compares

Decided in 19 days from validation, 37 days faster than East Lindsey's median of 56 for changes of use. Approved, as 91% of changes of use here are.

52%decided within 8 weeks
91%approved
102decided in the last year

Plota live figures for changes of use decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Consultation & key dates

Statutory expiry
16 Jun 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Change of use

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026