19 Lipscombe Rise, Alton, Hampshire, GU34 2HR Data via plota.co.uk

EHDC-26-0412-FUL - Full Planning Application Pending Consideration

Proposal

Change of use of ground-floor commercial floorspace to residential use, extension and reconfiguration of the existing building to create two dwellings Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Apr 2026
✓
Validated
26 May 2026
Decision
Target date was 21 Jul 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 181.

The consultation period closed on 16 Jun 2026.

Documents 33

Plans & drawings 28

PDF 19&19ALI-A-06-101 - Proposed Elevation Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-06-004 - Existing South Elevation Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-06-003 - Existing North Elevation Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-06-002 - Existing West Elevation Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-06-001 - Existing East Elevation Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-05-101 - Proposed Section Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-05-002 - Existing Section B-B' Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-05-001 - Existing Section A-A' Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-03-106 - Proposed Roof Plan Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-03-103 - Proposed Second Floor Plan Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-03-102 - Proposed First Floor Plan Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-03-101 - Proposed Ground Floor Plan Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-03-004 - Existing Roof Plan Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-03-003 - Existing Loft Floor Plan Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-03-002 - Existing First Floor Plan Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-03-001 - Existing Ground Floor Plan Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-02-103 - Proposed Street View Visualization Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-02-102 - Proposed Rear Visualization Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-02-101 - Proposed Front Visualization Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-02-002 - Existing Rear Visualization Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-01-002 - Block plan Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-01-001 - Location plan Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-01-002 - Block plans Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-02-001 - Existing Front Visualization Plan · 29 Jun 2026 View ↗ PDF 19&19ALI-A-06-102 - Proposed Elevation Plan · 29 Jun 2026 View ↗ PDF Proposed plans Application Documents · 27 May 2026 View ↗ PDF Existing plans Application Documents · 27 May 2026 View ↗ PDF Location plan Application Documents · 27 May 2026 View ↗

All documents on the council site ↗

Site constraints 3

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
National infrastructure project 2 km away: Southampton to London Pipeline Project; Inside the Alton (East Hampshire) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area60 m² (646 sq ft)
Energy ratingC (asset rating 54)
UseRetail/Financial and Professional Services
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in September 2025, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in East Hampshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Application
Postcode
GU34 2HR
Received
17 Apr 2026
Validated
26 May 2026
Ward
Alton Eastbrooke
Parish
Alton CP
Case officer
Show
Target decision
21 Jul 2026
Decision level
Delegated
Applicant
Show
Agent
UPP Architects + Town Planners

Decision outlook

Day 181, past the statutory target. 41% of demolitions in East Hampshire are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 181125 days past the 56-day target
14%decided within 8 weeks
91%approved
85decided in the last year

Plota live figures for demolitions decided by East Hampshire in the last twelve months, from validation. East Hampshire decision record →

Consultation & key dates

Comments by
16 Jun 2026
Statutory expiry
21 Jul 2026
East Hampshire
Planning Authority Score
1.5/10
Poor
#282 of 296 overall
Relevant to this application:
Change of use

East Hampshire is one of the slowest councils in England for householder decisions: #293 of 296 on speed. The council extends the time limit on 72% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Hampshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #153 of 296
91%
Householder approved
Above avg (90%) #173 of 296
24%
Decided in 8 weeks
Below avg (63%) #293 of 296
72%
Extended time limit
Above avg (41%) #288 of 296
63%
Minor dwellings approved
72 decided (1-9 homes)
78%
Major dwellings approved
9 decided (10+ homes)
88%
Change of use approved
24 decided
606
Total decisions
72 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.