DC/26/1940/DRC - Approval of Details Reserved by Cond. Approved

Proposal

Discharge part of Condition No.3 of DC/25/2818/VOC - Variation of Condition No.2 of - Various works including, new lift tower (including sprinkler tank relocation), general access improvements including access ramp and provision of a lift to all floors and internal reconfiguration and refurbishment and remodelled top floor activity space - revised plans in relation to tank details - Verification report Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 May 2026
✓
Approved
23 Jun 2026

Approved on 23 Jun 2026 · Delegated Decision · Last checked 6 Jul 2026

Associated applications 3

Site constraints 12

Grade II listed: The Britten Pears Building, Snape Maltings
List entry 1481153 · 8 m away · 4 more listed buildings within 150 m (1 Grade II*, 3 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 4 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Suffolk Coast & Heaths National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Bawdsey to Aldeburgh across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Snape Maltings conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage coast: Suffolk
A defined stretch of undeveloped coastline.
Development inconsistent with keeping the coast undeveloped is resisted.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special area of conservation 94 m away: Alde-Ore & Butley Estuaries
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 94 m away: Round Hill Pit, Aldeburgh SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Flood defence 26 m away (embankment, designed for a 1 in 25 year flood); Priority habitat 41 m away: Coastal saltmarsh.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area1,038 m² (11,173 sq ft)
Energy ratingE (asset rating 114)
UseD2 General Assembly and Leisure plus Night Clubs and Theatres
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in December 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details Reserved by Cond.
Postcode
IP17 1SP
Received
26 May 2026
Validated
26 May 2026
Ward
Rendlesham And Orford
Parish
Tunstall
Case officer
Show
Target decision
21 Jul 2026
Decision
Application Permitted
Decision date
23 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Bidwells

Consultation & key dates

Statutory expiry
21 Jul 2026
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 overall
Relevant to this application:
Major dwellings

East Suffolk is #183 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions
158 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.