Corralea Lodge, 154 Lattone Road, Corralea, Belcoo, Fermanagh, BT93 5DZ Data via plota.co.uk

Proposal

Extension & Alterations to existing dwelling, which comprises of private dwelling to upper floor, and B&B accommodation to lower ground floor, Car Port and Covered Terrace. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 May 2026
✓
Consultation
26 May 2026
✓
Validated
2 Sept 2026
✓
Approved
30 Sept 2026

Approved on 30 Sept 2026 · Last checked 6 Oct 2026

Documents 23

All documents on the council site ↗

Site constraints 1

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Fermanagh and Omagh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
BT93 5DZ
Received
20 May 2026
Validated
2 Sept 2026
Ward
Belcoo and Garrison
Decision
Granted
Decision date
30 Sept 2026
Applicant
Show
Agent
Donal McPhillips Architecture

How this decision compares

Decided in 28 days from validation, 37 days faster than Fermanagh and Omagh's median of 65 for changes of use. Approved, as 100% of changes of use here are.

46%decided within 8 weeks
100%approved
31decided in the last year

Plota live figures for changes of use decided by Fermanagh and Omagh in the last twelve months, from validation. Fermanagh and Omagh decision record →

Consultation & key dates

Planning Portal ref
PP-14935460
Neighbours
26 May 2026
Consultation
26 May 2026
Comments by
23 Sept 2026
Site or press notice
9 Sept 2026