Land To The North Of Sharp Tor, Widecombe In The Moor, Newton Abbot, TQ13 7PS Data via plota.co.uk

DOC/0271/25 BNG - Discharge Of Conditions Approved

Proposal

Temporary use of land for film-making with associated temporary sets, supporting facilities vehicles, access, parking and storage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Dec 2025
✓
Approved
21 Jan 2026

Approved on 21 Jan 2026 · Delegated decision · Last checked 1 Oct 2026

Site constraints 6

Dartmoor National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Priority habitat about 17 m away: Lowland heathland; Open access land about 35 m away: Access Land - Combined Open Country, Registered Common Land and Section 16 Dedicated Land. MoD Byelaw, Section 28 Exclusions, Racecourses and Aerodromes and ECP Margin have been removed..
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dartmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dartmoor
Application type
Discharge Of Conditions
Postcode
TQ13 7PS
Received
2 Dec 2025
Validated
2 Dec 2025
Ward
Teignbridge
Parish
Widecombe-in-the-Moor
Case officer
Show
Target decision
27 Jan 2026
Decision
Discharged
Decision date
21 Jan 2026
Decision level
Delegated decision
Applicant
Show
Agent
Planit Films Limited

How this decision compares

Decided in 50 days from validation, 6 days faster than Dartmoor's median of 56 for commercial and major works. Approved, as 88% of commercial and major works here are.

57%decided within 8 weeks
88%approved
7%go to committee

Plota live figures for commercial and major works decided by Dartmoor in the last twelve months, from validation. Dartmoor decision record →

Consultation & key dates

Statutory expiry
27 Jan 2026