One Leisure St Peters Road Huntingdon PE29 7DA
Description
Discharge of conditions 2 (Phasing Plan), 4 (Contamination Phase 1), 5 (Contamination Phase 2), 14 (Substation details), 22 (Bat Method Statement), 23 (Updated Badger Survey), 25 (CEMP/CEcMP), 36 (Acoustic Barrier Details), 39 (Details of cricket non turf pitches), 41 (Replacement cricket pitch implementation) and 42 (3G pitch implementation) of 25/02361/HDC
Huntingdonshire is slower than most councils at deciding householder applications, ranking #216 out of 292. 54% of applications have the time limit extended, above the 40% national average. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).
Other applications on this street
One Leisure St Peters Road Huntingdon PE29 7DA
Discharge of conditions 33 (Surface Water Drainage), 34 (Construction Drainage) ...
King George V Playing Field St Peters Road Huntingdon PE29 7DA
T356: Ash: Reduce by 2.5m
6 The Bridge Centre 34 St Peters Road Huntingdon PE29 7DA
External alterations, including addition of a roller shutter door and laying of ...
Nearby applications
One Leisure St Peters Road Huntingdon PE29 7DA
Discharge of conditions 33 (Surface Water Drainage), 34 (Construction Drainage) ...
29 St Peters Road Huntingdon PE29 7AA
T1. Ash. Reduce laterally over outbuilding and side road (North Side) by 1.5m to...
King George V Playing Field St Peters Road Huntingdon PE29 7DA
T356: Ash: Reduce by 2.5m