Andrew Marr International Ltd Livingstone Road Hessle East Riding Of Yorkshire HU13 0EE Data via plota.co.uk

26/30250/CONDET - Approval of Details req'd by Condition Approved

Proposal

Submission of details required by Conditions 5 (discharge of surface water) and 6 (Construction Environmental Management Plan (CEMP)) of planning permission 25/02535/PLF Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 May 2026
✓
Approved
14 Jul 2026

Approved on 14 Jul 2026 · Delegated Decision · Last checked 17 Jul 2026

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Public footpath 15 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Special area of conservation 17 m away: Humber Estuary
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Humber Bridge to Easington 13 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
SSSI 17 m away: Humber Estuary - 2000480 SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
National infrastructure project 536 m away: A63 Castle Street Improvement-Hull
The site is 536 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Flood defence 18 m away (engineered high ground); Inside the Hessle built-up area; Priority habitat 13 m away: No main habitat but additional habitats present.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 7 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area685 m² (7,373 sq ft)
Energy ratingE (asset rating 111)
UseB1 Offices and Workshop businesses
HeatingAir Conditioning

From the energy performance certificate lodged in September 2015, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details req'd by Condition
Postcode
HU13 0EE
Received
19 May 2026
Validated
19 May 2026
Ward
Hessle
Parish
Hessle Town Council
Case officer
Show
Target decision
14 Jul 2026
Decision
Approve
Decision date
14 Jul 2026
Decision level
Delegated Decision
Applicant
Show
Agent
ADP
Freehold owner
Show

Consultation & key dates

Alt. reference
PP-14947334
Planning Portal ref
PP-14947334
Comments by
10 Jul 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.