ALBRO HOUSE, 59 Palmerston Road, Harrow, HA3 7RR Data via plota.co.uk

Approved PL/1371/26 - Non-Material Amendment
Council
Date received
21 May 2026
Postcode
HA3 7RR
Type
Non-Material Amendment

Description

Non-Material amendment to planning permission dated 11/12/2023 to change wording of Condition 4 ( site levels); Condition 5 (Bird Hazard Management Plan); Condition 9 (permeable paving and long-term drainage); Condition 10 (green roofs); Condition 26 (sound insulation); Condition 32 (revised energy strategy); to include 'other than demolition works' and Condition 12 A; (demolition and construction logistics plan) to include 'No demolition shall take place until a demolition plan has first been submitted to the Local Planning Authority in writing to be agreed. The plan shall detail the arrangements for (but not limited to): - the parking of vehicles of site operatives and visitors for demolition works. - loading and unloading of plant and materials for demolition works; - storage of plant and materials used in demolition of the existing structures; - the erection and maintenance of security hoardings; - a scheme for recycling/disposing of waste resulting from demolition; - measures for the control and reduction of dust; - measures for the control and reduction of noise and vibration.' B; insert 'other than demolition' and remove 'demolition and'… Data via plota.co.uk

Last checked

Associated applications 5

Site constraints 5

Locally significant industrial site
A borough-level industrial site.
Boroughs protect these sites for industrial and related uses.
Air quality management area: Harrow AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Wealdstone
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Harrow built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Harrow - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Harrow
Planning Authority Score
4.9/10
Below average
#153 of 296 councils
Relevant to this application:
Householder decisions

Harrow ranks #115 out of 296 councils for householder decision speed. Harrow is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

One of the strictest councils
only 83% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Harrow decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #273 of 296
83%
Householder approved
Below avg (90%) #261 of 296
71%
Decided in 8 weeks
Above avg (63%) #115 of 296
33%
Extended time limit
Below avg (41%) #77 of 296
44%
Minor dwellings approved
133 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
38%
Change of use approved
26 decided
1,330
Total decisions
298 refused in the year to March 2026