Land Near Bodelwyddan Conwy Border LL22 9SD Data via plota.co.uk

Proposal

Construction, operation & decommissioning of a proposed solar photovoltaic (PV) electricity generating system, associated solar arrays, inverters, transformers, substations & ancillary buildings, accesses, internal access tracks, landscaping & biodiversity, fencing/CCTV, cabling and associated ancillary development Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 May 2026
✓
Validated
27 Oct 2026
Decision
Expected by 22 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 22 Dec 2026 and 16 Jan 2027, from Conwy's recent commercial and major works.

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
Radon affected area, class 3; National infrastructure project about 1876 m away: Awel y Môr Offshore Wind Farm.
Not affected
No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Conwy - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Conwy
Application type
Full
Postcode
LL22 9SD
Received
20 May 2026
Validated
27 Oct 2026
Ward
Gele and Llanddulas
Parish
Cyngor Tref Abergele Town Council
Case officer
Show
Decision level
DC East Team Leader

Decision outlook

Day 22 of the 56-day target. Conwy usually decides commercial and major works by day 60.

Day 2238 days to the predicted decision (day 60)
43%decided within 8 weeks
80%approved
13%go to committee

Plota live figures for commercial and major works decided by Conwy in the last twelve months, from validation. Conwy decision record →