Land in the Vicinity of Spalding Tee-Point Surfleet Seas End and Moulton Seas End Data via plota.co.uk

Proposal

Construction of the new Air Insulated Substation (AIS) - 400kV Weston Marsh Substation A, associated landscaping and environmental mitigation works, drainage, highways and other associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 May 2026
✓
Approved
6 Nov 2026

Approved on 6 Nov 2026 · Last checked 6 Nov 2026

Planning committee

Decided by South Holland Planning Committee on 21 Oct 2026.

Approved

No officer report was published for this decision; this summary is from the committee minutes.

  • Members weighed the substation’s national energy benefits against its landscape, environmental and residential effects.
  • A National Grid supporter, an Outer Dowsing supporter and a resident objector spoke.
  • The committee approved the application with amended landscaping and construction-hours conditions.

Source: Plota analysis of South Holland's committee minutes, South Holland Planning Committee minutes, 21 October 2026 .

Site constraints 5

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
1 listed building within 150 m of the postcode pin; Inside the Moulton Seas End built-up area; National infrastructure project about 1212 m away: Eastern Green Link 3 and Eastern Green Link 4, at pre-application; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 1, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in South Holland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
PE12
Received
18 May 2026
Validated
18 May 2026
Parish
Weston
Case officer
Show
Target decision
9 Nov 2026
Decision
Approved
Decision date
6 Nov 2026
Agent
Atkins Realis

How this decision compares

Decided in 172 days from validation, 116 days slower than South Holland's median of 56 for commercial and major works. Approved, as 86% of commercial and major works here are.

54%decided within 8 weeks
86%approved
38decided in the last year

Plota live figures for commercial and major works decided by South Holland in the last twelve months, from validation. South Holland decision record →

South Holland
Planning Authority Score
3.6/10
Below average
#216 of 296 councils
Relevant to this application:
Householder decisions

South Holland ranks #170 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
South Holland decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #260 of 296
89%
Householder approved
Below avg (90%) #210 of 296
62%
Decided in 8 weeks
Below avg (63%) #170 of 296
44%
Extended time limit
Above avg (41%) #185 of 296
63%
Minor dwellings approved
156 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
67%
Change of use approved
12 decided
607
Total decisions
119 refused in the year to March 2026