EDF ENERGY RENEWABLESHARTLEPOOL POWER STATION TEES ROADHARTLEPOOLTS25 2BZ

Pending H/2026/0151
Council
Date received
18 May 2026
Postcode
TS25 2BZ

Description

First floor permanent Portakabin building to the existing ground floor Portakabin building, to provide office, welfare, and changing facilities. Installation of external stair case and a two storey extension to side.

Hartlepool
Planning Authority Score
3.4/10
Poor
#220 of 292 councils
Relevant to this application:
Householder decisions

Hartlepool is slower than most councils at deciding householder applications, ranking #224 out of 292. The council extends the time limit on 55% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hartlepool decision performance
Based on MHCLG data, 2025
94%
Overall approval rate
Above avg (87%) #35 of 292
94%
Householder approved
Above avg (90%) #106 of 292
53%
Decided in 8 weeks
Below avg (64%) #224 of 292
55%
Extended time limit
Above avg (40%) #250 of 292
100%
Minor dwellings approved
14 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
89%
Change of use approved
18 decided
229
Total decisions
13 refused in 2025