Folds Road Footbridge Folds Road Haydock St Helens Data via plota.co.uk

P/2026/0488/PN18 - Prior Notification Under Part 18 Approved

Proposal

Prior approval for demolition and replacement of footbridge. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Sept 2026
✓
Validated
21 Sept 2026
✓
Consultation
22 Sept 2026
✓
Approved
16 Nov 2026

Approved on 16 Nov 2026 · Delegated Decision · Last checked 17 Nov 2026

Site constraints 9

Green belt: Merseyside and Greater Manchester
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Public footpath 4 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Priority habitat: Deciduous woodland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Habitat network: Other Priority Habitats -NEX
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Flood defence 9 m away (natural high ground, designed for a 1 in 5 year flood); Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in St Helens - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
St Helens
Application type
Prior Notification Under Part 18
Received
14 Sept 2026
Validated
21 Sept 2026
Ward
Blackbrook Ward
Case officer
Show
Target decision
16 Nov 2026
Decision
Prior Not Required
Decision date
16 Nov 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 56 days from validation, about the council's usual 55 days. Approved, as 98% of demolitions here are.

70%decided within 8 weeks
98%approved
45decided in the last year

Plota live figures for demolitions decided by St Helens in the last twelve months, from validation. St Helens decision record →

Public comments

No public comments yet.

3 neighbours consulted · Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Neighbours
13 Oct 2026
Consultation
22 Sept 2026
Comments by
3 Nov 2026
Site or press notice
12 Oct 2026
Statutory expiry
16 Nov 2026
Env. assessment
No
St Helens
Planning Authority Score
8.2/10
Excellent
#22 of 296 overall
Relevant to this application:
Householder decisions

St Helens is faster than most councils at deciding householder applications: #38 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
St Helens decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #28 of 296
97%
Householder approved
Above avg (90%) #43 of 296
80%
Decided in 8 weeks
Above avg (63%) #38 of 296
33%
Extended time limit
Below avg (41%) #81 of 296
90%
Minor dwellings approved
20 decided (1-9 homes)
75%
Major dwellings approved
12 decided (10+ homes)
91%
Change of use approved
46 decided
499
Total decisions
26 refused in the year to March 2026