PA/25/01664/NC - Full Planning Permission Approved

Proposal

Replacement of existing timber framed windows and doors with UPVC Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 30 Oct 2025
✓
Consultation
6 Nov 2025
✓
Approved
9 Dec 2025

Approved on 9 Dec 2025 · Delegated · Last checked 2 Nov 2026

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 427 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area: Tower Hamlets APA 2.7
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Thames Path 19 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
Also on the record
1 listed building within 150 m; Inside the Tower Hamlets built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square; Designated open space 13 m away.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area60 m² (646 sq ft)
Energy ratingC (76 out of 100)
PropertySemi-detached flat, 3 habitable rooms
Built1996 to 2002
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in September 2016, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E1W 1NX
Received
around 30 Oct 2025
Validated
30 Oct 2025
Ward
St Katharines and Wapping
Case officer
Show
Target decision
25 Dec 2025
Decision
Permit
Decision date
9 Dec 2025
Decision level
Delegated
Applicant
Show
Agent
Archway Building Consultancy Ltd
Freehold owner
Show

How this decision compares

Decided in 40 days from validation, 16 days faster than Tower Hamlets's median of 56 for full applications. Approved, as 85% of full applications here are.

60%decided within 8 weeks
85%approved
557decided in the last year

Plota live figures for full applications decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Neighbours
6 Nov 2025
Consultation
6 Nov 2025
Comments by
27 Nov 2025
Statutory expiry
25 Dec 2025
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.