Land adjacent and 25 metres south of 42 Bettys Hill Road, Newry BT34 2NB Data via plota.co.uk

LA07/2026/1040/F - Full Valid

Proposal

Erection of dwelling and associated site works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Sept 2026
✓
Validated
8 Sept 2026
Decision
Target date was 3 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 21 Mar 2027 and 26 Apr 2027, from Newry Mourne Down's recent full applications.

Comments are open until 9 Dec 2026

Comment on this application ↗

Site constraints 1

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newry Mourne Down - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full
Postcode
BT34 2NB
Received
3 Sept 2026
Validated
8 Sept 2026
Ward
Derryleckagh
Applicant
Show
Agent
O’Callaghan Planning

Decision outlook

Day 71 of the 56-day target. Newry Mourne Down usually decides full applications by day 211.

Day 71140 days to the predicted decision (day 211)
4%decided within 8 weeks
98%approved
487decided in the last year

Plota live figures for full applications decided by Newry Mourne Down in the last twelve months, from validation. Newry Mourne Down decision record →

Consultation & key dates

Planning Portal ref
PP-15176391
Comments by
9 Dec 2026
Site or press notice
25 Nov 2026