Management Suite Cascades Portsmouth PO1 4RL Data via plota.co.uk

26/01074/FUL - Full Application Awaiting decision

Proposal

Installation of 11 padel courts at roof level of the Cascades Car Park, together with associated enclosures and external lighting, and one internal padel court within the existing atrium roof space, including all necessary ancillary facilities. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
15 Sept 2026
✓
Validated
30 Oct 2026
✓
Consultation
4 Nov 2026
Decision
Expected by 29 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision between 2 Jan 2027 and 27 Jan 2027, from Portsmouth's recent commercial and major works.

Comments are open until 4 Dec 2026

Comment on this application ↗

Documents 30

Plans & drawings 27

PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P403 PADEL COURT INFORMATION Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P404 PADEL COURT PLAN AND ELEVATIO Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P405 PADEL COURT PLAN AND ELEVATIO Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P402 RECEPTION AND CAFE BUILDING Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P401 ENTRANCE AND WELFARE BUILDING Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P104 PROPOSED FACILITIES PLAN Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P102 PROPOSED ROOF PLAN Drawing · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P02 PROPOSED SITE PLAN Block Plan · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P01 PROPOSED LOCATION BLOCK PLAN Block Plan · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-E104 DEMOLITION LEVEL 5-6 PLAN Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P100 PROPOSED LEVEL 1-2 GA PLAN Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-E101 EXISTING LEVEL 5-6 GA PLAN Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-E02 EXISTING SITE PLAN Drawing · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-E100 EXISTING LEVEL 1-2 GA PLAN Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-E103 DEMOLITION LEVEL 1-2 PLAN Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-E102 EXISTING ROOF PLAN Drawing · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P103 PROPOSED LEVEL 1-2 GA PLAN Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P101 PROPOSED LEVEL 5-6 GA PLAN Additional Plans · 15 Sept 2026 View ↗ PDF 1354-DR-101-P1 - SW MANAGEMENT LAYOUT Additional Plans · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-E204 INTERNAL ELEVATIONS EAST AND Drawing · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-E203 INTERNAL ELEVATIONS NORTH AND Drawing · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-E202 EXTERNAL ELEVATIONS EAST AND Drawing · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-E201 EXTERNAL ELEVATIONS NORTH AND Drawing · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P202 PROPOSED ELEVATIONS EAST AND Drawing · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P204 INTERNAL ELEVATIONS EAST AND Drawing · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P201 PROPOSED ELEVATIONS NORTH AND Drawing · 15 Sept 2026 View ↗ PDF 25.24 PADEL TREE PORTSMOUTH PLANNING DRAWINGS-P203 INTERNAL ELEVATIONS NORTH AND Drawing · 15 Sept 2026 View ↗

All documents on the council site ↗

Site constraints 6

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Also on the record
2 listed buildings within 150 m; Radon affected area, class 3; Registered park or garden 175 m away: Victoria Park; Conservation area 83 m away: Guildhall and Victoria Park; Inside the Portsmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 5 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area27 m² (291 sq ft)
Energy ratingB (asset rating 38)
UseRetail/Financial and Professional Services
HeatingAir Conditioning

From the energy performance certificate lodged in October 2024, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Full Application
Postcode
PO1 4RL
Received
15 Sept 2026
Validated
30 Oct 2026
Ward
Charles Dickens
Case officer
Show
Target decision
29 Jan 2027
Decision level
Delegated
Agent
CarneySweeney

Decision outlook

Day 19 of the 56-day target. Portsmouth usually decides commercial and major works by day 68.

Day 1949 days to the predicted decision (day 68)
36%decided within 8 weeks
80%approved
12%go to committee

Plota live figures for commercial and major works decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

No public comments yet.

77 neighbours consulted · Last counted 12 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15136958
Planning Portal ref
PP-15136958
Neighbours
4 Nov 2026
Consultation
4 Nov 2026
Comments by
4 Dec 2026
Site or press notice
13 Nov 2026
Statutory expiry
29 Jan 2027
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Householder decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.