Cherry Burton Golf Club Leconfield Road Cherry Burton East Riding Of Yorkshire HU17 7LJ Data via plota.co.uk

26/01846/PLF - Full Planning Permission Pending Consideration

Proposal

Change of use of land to site 35 holiday lodges with ancillary works; formation of new vehicle access; erection of brick entrance walls and pillars to existing and proposed vehicle access; alterations to existing clubhouse; change of use and extension of existing driving range building to create fitness centre and grounds maintenance shed; construction of Padel Court facilities and children's playground Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Jul 2026
✓
Validated
7 Aug 2026
Decision
Expected by 6 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 63.

The consultation period closed on 10 Sept 2026.

Documents 20

All documents on the council site ↗

Site constraints 2

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 84 m away: Hornsea Project Four Offshore Wind Farm
The site is 84 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Dogger Bank South Offshore Wind Farms (decided, 1348 m); Dogger Bank D Wind Farm (at pre-application, the site is inside its boundary); Clean Air Solar Farm (at pre-application, 8 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 1

Last sold for £655,123 in September 2018. Other property, freehold.

27 September 2018£655,123Recorded as a transfer outside a standard sale

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area193 m² (2,077 sq ft)
Energy ratingC (asset rating 53)
UseD2 General Assembly and Leisure plus Night Clubs and Theatres
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in July 2013, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
HU17 7LJ
Received
17 Jul 2026
Validated
7 Aug 2026
Ward
Beverley Rural
Parish
Cherry Burton Parish Council
Case officer
Show
Target decision
6 Nov 2026
Applicant
Show
Agent
WS Planning
Freehold owner
Show

Decision outlook

Day 63, past the statutory target. 96% of changes of use in East Riding are decided within thirteen weeks, which runs to 6 Nov 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 2 Oct 2026.

Day 637 days past the 56-day target
85%decided within 8 weeks
77%approved
165decided in the last year

Plota live figures for changes of use decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

1comment received
1 neutral

Last counted 2 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14904931
Planning Portal ref
PP-14904931
Comments by
10 Sept 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Change of use

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.