Bus Shelter,Pavement Opposite Westfield Entrance,Wood Lane,London,W12 7DP Data via plota.co.uk

P/2026/01580/ADV - Advertisement Approved

Proposal

Display of double sided internally illuminated LCD digital screen measuring 2100mm (height) x 1338mm (width) at relocated bus shelter on the public highway. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Jun 2026
✓
Validated
22 Jun 2026
✓
Approved
16 Oct 2026

Approved on 16 Oct 2026 · Last checked 17 Oct 2026

Site constraints 8

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
National infrastructure project 1155 m away: Thames Tideway Tunnel; Conservation area 62 m away: Shepherds Bush; 1 listed building within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre 22 m away: Shepherds Bush Town Centre.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Advertisement
Postcode
W12 7DP
Received
19 Jun 2026
Validated
22 Jun 2026
Ward
Shepherd's Bush Green
Case officer
Show
Decision
APPLICATION APPROVED
Decision date
16 Oct 2026
Applicant
Show

How this decision compares

Decided in 116 days from validation, 48 days slower than Hammersmith and Fulham's median of 68 for signs and adverts. Approved, as 95% of signs and adverts here are.

32%decided within 8 weeks
95%approved
77decided in the last year

Plota live figures for signs and adverts decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Public comments

No public comments yet.

Read the comments on the council site ↗

Consultation & key dates

Consultation
8 Jul 2026
Comments by
5 Aug 2026
Site or press notice
15 Jul 2026
Statutory expiry
17 Aug 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Other decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026