Hammersmith Apollo,Queen Caroline Street,London,Hammersmith And Fulham,W6 9QH Data via plota.co.uk

Proposal

Installation of a kitchen extract fan, rooftop hatch, guardrail system & external ductwork to the catering block to the south-west of the Hammersmith Apollo Theatre. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
29 Jun 2026
Decision
Expected by 24 Aug 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision around 14 Sept 2026; it is now day 77. The consultation period closed on 12 Aug 2026.

Documents 25

Plans & drawings 15

PDF HA-708-FWS-01-ZZ-DR-A-0204-PROPOSED SECTION A-PL1 .pdf Proposed Drawings · 11 May 2026 View ↗ PDF Elevation (Rear) - Proposed_included_in_Elevation (Front) - Proposed.pdf Proposed Drawings · 11 May 2026 View ↗ PDF HA-708-FWS-01-ZZ-DR-A-0203-PROPOSED EXTERNAL ELEVATIONS 2 3-PL1 .pdf Proposed Drawings · 11 May 2026 View ↗ PDF HA-708-FWS-01-ZZ-DR-A-0202-PROPOSED EXTERNAL ELEVATION 1-PL1 .pdf Proposed Drawings · 11 May 2026 View ↗ PDF HA-708-FWS-01-ZZ-DR-A-0104-EXISTING_ DEMO SECTION A-PL1 .pdf Existing Drawings · 11 May 2026 View ↗ PDF Elevation (Rear) - Existing_included_in_Elevation (Front) - Existing.pdf Existing Drawings · 11 May 2026 View ↗ PDF HA-708-FWS-01-ZZ-DR-A-0103-EXISTING_ DEMO EXTERNAL ELEVATIONS 2 3-PL1 .pdf Existing Drawings · 11 May 2026 View ↗ PDF HA-708-FWS-01-ZZ-DR-A-0102-EXISTING_ DEMO EXTERNAL ELEVATION 1-PL1 .pdf Existing Drawings · 11 May 2026 View ↗ PDF HA-708-FWS-01-GF-DR-A-0201-PROPOSED GF_ FF_ RF CATERING BLOCK PLANS-PL1 .pdf Drawing · 11 May 2026 View ↗ PDF HA-708-FWS-01-GF-DR-A-0101-EXISTING_ DEMO GF_ FF_ RF CATERING BLOCK PLANS-PL1 .pdf Existing Drawings · 11 May 2026 View ↗ PDF Layout Plan - Proposed_included_in_Layout Plan - Existing.pdf Proposed Drawings · 11 May 2026 View ↗ PDF HA 708 FWS 00 00 DR A 0001 SITE PLAN PL1.pdf Existing Drawings · 11 May 2026 View ↗ PDF The location plan_included_in_Block plan of the site.pdf Drawing · 11 May 2026 View ↗ PDF SiteBlock Plan - Existing_included_in_Block plan of the site.pdf Existing Drawings · 11 May 2026 View ↗ PDF 708 FWS-P1-GF-DR-A 00.00.pdf Drawing · 11 May 2026 View ↗

All documents on the council site ↗

Site constraints 8

Grade II* listed: Former Odeon Cinema
List entry 1252993 · 6 m from the pin · 8 more listed buildings within 150 m (1 Grade II*, 6 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 8 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Hammersmith Odeon conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Archaeological priority area: Possible original Saxon settlement of Hammersmith around Creek mouth
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Hammersmith Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Also on the record
Inside the Hammersmith and Fulham built-up area; Heritage at risk 85 m away: Tomb of Samuel Jones, Queen Caroline Street, St Paul's Churchyard.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
W6 9QH
Validated
29 Jun 2026
Ward
Hammersmith Broadway
Case officer
Show
Applicant
Show

Decision outlook

Day 77, past the statutory target. 64% of utility and infrastructure works in Hammersmith and Fulham are decided within thirteen weeks, which runs to 28 Sept 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 12 Sept 2026.

Day 7721 days past the 56-day target
43%decided within 8 weeks
96%approved
28decided in the last year

Plota live figures for utility and infrastructure works decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
12 Jul 2026
Comments by
12 Aug 2026
Site or press notice
22 Jul 2026
Statutory expiry
24 Aug 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 councils
Relevant to this application:
Householder decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions, ranking #281 out of 296. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026