1 Knighten Street, London, E1W Data via plota.co.uk

PA/26/01514/A1 - Class E to resi Registered

Proposal

Notification for Prior Approval under schedule 2, Part 3, Class MA of Town and Country Planning (General Permitted Development Order) 2015 for change of use from office (Use Class E) to 3 flats (Class C3). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 27 Aug 2026
✓
Consultation
24 Sept 2026
Decision
Expected by 22 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 22 Oct 2026, from Tower Hamlets's recent changes of use.

Comments are open until 16 Oct 2026

Comment on this application ↗

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project: Thames Tideway Tunnel
The site is inside the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 240 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Archaeological priority area: Tower Hamlets APA 2.7
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
15 listed buildings within 150 m
Nearest: Surviving Boundary Walls to the Former London Docks (Western Dock), at Thomas More Street, East Smithfield, Redmead Lane, Pennington Street, Wapping Lane, Reardon Street and Tench Street. With Gate Pi, Grade II, 15 m away · 14 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 15 with distances
Historic England ↗
Conservation area 6 m away: Wapping Pierhead
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Also on the record
Inside the Tower Hamlets built-up area; Public transport access: PTAL 2 (poor), TfL 2023, for the 100 m square.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Class E to resi
Received
around 27 Aug 2026
Validated
27 Aug 2026
Ward
St Katharines and Wapping
Case officer
Show
Target decision
22 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
Dimension - Planning & Architecture

Decision outlook

Day 43 of the 56-day target. Tower Hamlets usually decides changes of use by day 56.

Day 4313 days to the 56-day target
66%decided within 8 weeks
55%approved
52decided in the last year

Plota live figures for changes of use decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Comments by
16 Oct 2026
Site or press notice
24 Sept 2026
Statutory expiry
22 Oct 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Change of use

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026