BIDSTON DOCK Wallasey Bridge Road, Bidston, Wirral Data via plota.co.uk

APP/25/01800 - Full Planning Permission Approved

Proposal

Drainage Proposals to serve David Lloyd and wider land at Bidston Docks Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Nov 2025
✓
Validated
19 Dec 2025
✓
Approved
13 Mar 2026

Approved on 13 Mar 2026 · Delegated · Last checked 19 Oct 2026

Documents 11

Statements & assessments 3

PDF Commenter’s name hidden Show OneApp Attachments - Public · 19 Dec 2025 View ↗
PDF Commenter’s name hidden Show OneApp Attachments - Public · 19 Dec 2025 View ↗
PDF Commenter’s name hidden Show OneApp Attachments - Public · 19 Dec 2025 View ↗

Plans & drawings 2

PDF Commenter’s name hidden Show Revised Document (Public) · 17 Feb 2026 View ↗
PDF Commenter’s name hidden Show OneApp Attachments - Public · 24 Nov 2025 View ↗

Other documents 4

PDF Commenter’s name hidden Show OneApp Attachments - Public · 19 Dec 2025 View ↗
PDF Commenter’s name hidden Show OneApp Attachments - Public · 20 Nov 2025 View ↗
PDF Commenter’s name hidden Show OneApp Attachments - Public · 20 Nov 2025 View ↗
PDF Commenter’s name hidden Show OneApp Attachments - Public · 20 Nov 2025 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 3

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
National infrastructure project: Mersey Tidal Power Project, at pre-application; Inside the Wallasey built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wirral - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wirral
Application type
Full Planning Permission
Received
19 Nov 2025
Validated
19 Dec 2025
Ward
Bidston and St James
Case officer
Show
Target decision
16 Mar 2026
Decision
Conditional Approval
Decision date
13 Mar 2026
Decision level
Delegated
Applicant
Show
Agent
Lichfields

How this decision compares

Decided in 84 days from validation, 21 days slower than Wirral's median of 63 for utility and infrastructure works. Approved, as 97% of utility and infrastructure works here are.

43%decided within 8 weeks
97%approved
5%go to committee

Plota live figures for utility and infrastructure works decided by Wirral in the last twelve months, from validation. Wirral decision record →

Consultation & key dates

Comments by
20 Feb 2026
Statutory expiry
16 Mar 2026
Wirral
Planning Authority Score
3.3/10
Poor
#227 of 296 councils
Relevant to this application:
Householder decisions

Wirral is slower than most councils at deciding householder applications, ranking #200 out of 296. Householder applications are slightly more likely to be approved here (90%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Wirral decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #164 of 296
90%
Householder approved
Above avg (90%) #198 of 296
57%
Decided in 8 weeks
Below avg (63%) #200 of 296
45%
Extended time limit
Above avg (41%) #197 of 296
62%
Minor dwellings approved
47 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
77%
Change of use approved
61 decided
909
Total decisions
112 refused in the year to March 2026