Land North Of Albion Street Albion Street Bolton BL5 3PZ Data via plota.co.uk

02000/26/PREMIN Deposited

Proposal

Erection of 6 no. dwellings Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Nov 2026
Decision
Expected by 3 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 30 Dec 2026 and 9 Jan 2027, from Bolton's recent new homes.

Site constraints 3

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area; Inside the Wingates built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bolton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bolton
Postcode
BL5 3PZ
Received
5 Nov 2026
Validated
5 Nov 2026
Ward
Westhoughton North & Hunger Hill
Parish
Westhoughton Town Council
Case officer
Show
Target decision
3 Dec 2026
Applicant
Show

Decision outlook

Day 18 of the 56-day target. Bolton usually decides new homes by day 56.

Day 1838 days to the 56-day target
52%decided within 8 weeks
53%approved
91decided in the last year

Plota live figures for new homes decided by Bolton in the last twelve months, from validation. Bolton decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
3 Dec 2026
Env. assessment
No
Bolton
Planning Authority Score
2.5/10
Poor
#250 of 296 overall
Relevant to this application:
Householder decisions

Bolton is slower than most councils at deciding householder applications: #229 of 296 on speed. Bolton is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

One of the strictest councils
only 83% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Bolton decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #263 of 296
83%
Householder approved
Below avg (90%) #259 of 296
51%
Decided in 8 weeks
Below avg (63%) #229 of 296
44%
Extended time limit
Above avg (41%) #175 of 296
63%
Minor dwellings approved
70 decided (1-9 homes)
83%
Major dwellings approved
12 decided (10+ homes)
62%
Change of use approved
113 decided
996
Total decisions
208 refused in the year to March 2026