SMD/2025/0108 - Full - MINOR Consultations/Re-consultations issued

Proposal

Replacement of Windows and Doors (retrospective) 2a - 8 New Street Leek ST13 6EB Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Mar 2025
✓
Validated
22 May 2025
Decision
Target date was 17 Jul 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 19 Nov 2026; it is now day 546.

The consultation period closed on 25 Jun 2025.

Site constraints 6

Leek conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
10 listed buildings within 150 m of the postcode pin
Nearest: 33 and 35, Bath Street, Grade II, about 58 m from the postcode pin · 2 Grade II*, 8 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 10 with distances
Historic England ↗
Also on the record
Radon affected area, class 2; Inside the Leek built-up area; National infrastructure project about 1107 m away: Peak Cluster CCS Pipeline, at pre-application; Air quality management area about 9 m away: SMDC AQMA No.1 : Leek.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Staffordshire Moorlands - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full - MINOR
Postcode
ST13 6EB
Received
3 Mar 2025
Validated
22 May 2025
Case officer
Show
Target decision
17 Jul 2025
Decision level
Delegated Decision
Applicant
Show
Agent
Hulme Upright

Decision outlook

Day 546, past the statutory target. 59% of full applications in Staffordshire Moorlands are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 16 Nov 2026.

Day 546490 days past the 56-day target
30%decided within 8 weeks
62%approved
143decided in the last year

Plota live figures for full applications decided by Staffordshire Moorlands in the last twelve months, from validation. Staffordshire Moorlands decision record →

Consultation & key dates

Consultation
22 May 2025
Comments by
25 Jun 2025
Staffordshire Moorlands
Planning Authority Score
0.4/10
Poor
#296 of 296 councils
Relevant to this application:
Householder decisions

Staffordshire Moorlands is one of the slowest councils in England for householder decisions, ranking #277 out of 296. The council extends the time limit on 66% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Staffordshire Moorlands is also one of the strictest councils - it refuses more householder applications than almost any other, with only 76% approved vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Staffordshire Moorlands decision statistics
Based on MHCLG data, the year to March 2026
76%
Overall approval rate
Below avg (87%) #283 of 296
76%
Householder approved
Below avg (90%) #292 of 296
36%
Decided in 8 weeks
Below avg (63%) #277 of 296
66%
Extended time limit
Above avg (41%) #280 of 296
59%
Minor dwellings approved
41 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
75%
Change of use approved
36 decided
396
Total decisions
94 refused in the year to March 2026