35 - 39 Cove Road Farnborough Hampshire GU14 0EJ Data via plota.co.uk

26/00392/ADVPP - Advertisement via Planning Portal Awaiting decision

Proposal

Display of internally illuminated fascia sign Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Jul 2026
✓
Consultation
28 Jul 2026
Decision
Expected by 23 Nov 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 139.

The consultation period closed on 18 Aug 2026.

Site constraints 3

National infrastructure project 417 m away: Southampton to London Pipeline Project
The site is 417 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
1 listed building within 150 m; Inside the Farnborough built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rushmoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rushmoor
Application type
Advertisement via Planning Portal
Postcode
GU14 0EJ
Received
7 Jul 2026
Validated
7 Jul 2026
Ward
Empress
Case officer
Show
Target decision
23 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Idea Architectural Technology

Decision outlook

Day 139, past the statutory target. 100% of advertisement consent in Rushmoor are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 21 Nov 2026.

Day 13983 days past the 56-day target
84%decided within 8 weeks
63%approved
20decided in the last year

Plota live figures for advertisement consent decided by Rushmoor in the last twelve months, from validation. Rushmoor decision record →

Public comments

No public comments yet.

14 neighbours consulted · Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15032655
Planning Portal ref
PP-15032655
Neighbours
28 Jul 2026
Consultation
28 Jul 2026
Comments by
18 Aug 2026
Site or press notice
28 Jul 2026
Statutory expiry
1 Sept 2026
Env. assessment
No
Rushmoor
Planning Authority Score
8.9/10
Excellent
#9 of 296 overall
Relevant to this application:
Other decisions

Rushmoor is one of the fastest councils in England for householder decisions: #22 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Rushmoor decision statistics
Based on MHCLG data, the nine months to December 2025
95%
Overall approval rate
Above avg (87%) #26 of 296
97%
Householder approved
Above avg (90%) #41 of 296
86%
Decided in 8 weeks
Above avg (63%) #22 of 296
26%
Extended time limit
Below avg (41%) #36 of 296
71%
Minor dwellings approved
14 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
100%
Change of use approved
7 decided
257
Total decisions
13 refused in the nine months to December 2025