Cottingham High School And Sixth Form College Harland Way Cottingham East Riding Of Yorkshire HU16 5PX Data via plota.co.uk

26/30401/CONDET - Approval of Details req'd by Condition Pending Consideration

Proposal

Submission of details required by Conditions 2 (design and layout of artificial pitch), 8 (Construction Environmental Management Plan (CEMP)) and 12 (Construction Traffic Management Plan (CTMP)) of planning permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Aug 2026
Decision
Expected by 13 Oct 2026

Under consideration

No decision has been issued yet. A decision is expected by 13 Oct 2026.

The consultation period closed on 1 Oct 2026.

Associated applications 4

Site constraints 2

National infrastructure project 904 m away: Dogger Bank Creyke Beck
The site is 904 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Peartree Hill Solar Farm (decided, 906 m); Hornsea Project Four Offshore Wind Farm (decided, 985 m); Dogger Bank South Offshore Wind Farms (decided, 1790 m); Dogger Bank D Wind Farm (at pre-application, 156 m); Clean Air Solar Farm (at pre-application, 694 m); East Coast Hydrogen Humber Pipeline (at pre-application, 1257 m); North Humber to High Marnham (at pre-application, 1269 m); Continental Link Multi-Purpose Interconnector (withdrawn, 1774 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Cottingham built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval of Details req'd by Condition
Postcode
HU16 5PX
Received
18 Aug 2026
Validated
18 Aug 2026
Ward
Cottingham North
Parish
Cottingham Parish Council
Case officer
Show
Target decision
13 Oct 2026
Applicant
Show
Agent
Surfacing Standards Limited

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15167286
Planning Portal ref
PP-15167286
Comments by
1 Oct 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Householder decisions

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026