Bethany Welsh Chapel, New Street, Burry Port Data via plota.co.uk

PL/10668 - Full planning permission Refused

Proposal

Change of use from existing chapel into single residential dwelling Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
16 Mar 2026
✓
Validated
18 Mar 2026
✗
Refused
23 Oct 2026
Appeal
Not lodged

Refused on 23 Oct 2026 · Last checked 28 Oct 2026

Planning committee

Decided by Carmarthenshire Planning Committee on 22 Oct 2026.

Refused

No officer report was published for this decision; this summary is from the committee minutes.

  • Officers recommended refusal of the change of use.
  • Local Members supported the proposal, citing flood works, the building’s condition and support from residents and the Town Council.
Read how the committee decided The proposed change of use, local support, officers’ recommendation and committee consideration.

Source: Plota analysis of Carmarthenshire's committee minutes of 22 Oct 2026.

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Coalfield, development low risk area; National infrastructure project 1179 m away: Gwynt Glas Offshore Wind Farm, at pre-application.
Not affected
No listed building at the site · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Carmarthenshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Received
16 Mar 2026
Validated
18 Mar 2026
Ward
Burry Port
Parish
Pembrey and Burry Port Town
Case officer
Show
Target decision
31 Dec 2026
Decision
Full Refusal
Decision date
23 Oct 2026

How this decision compares

Decided in 219 days from validation, 163 days slower than Carmarthenshire's median of 56 for changes of use. Refused, as 27% of changes of use here are.

51%decided within 8 weeks
73%approved
88decided in the last year

Plota live figures for changes of use decided by Carmarthenshire in the last twelve months, from validation. Carmarthenshire decision record →

Consultation & key dates

Comments by
23 Oct 2026