Land to south of septic tank/west of Brampton Beck, Brampton, Appleby-in-Westmorland, Cumbria, CA16 6JS Data via plota.co.uk

3/26/9001 Application under consideration

Proposal

Extension of existing Septic Tank site to accommodate upgraded wastewater treatment infrastructure, alterations to existing highway access, creation of new access track and associated land reprofiling, landscaping and associated ancillary development. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Sept 2026
Decision
Target date was 29 Oct 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 81.

The consultation period closed on 7 Oct 2026.

Documents 42

All documents on the council site ↗

Site constraints 8

2 listed buildings within 150 m of the postcode pin
Nearest: NEW INN, Grade II, about 15 m from the postcode pin · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Nutrient neutrality catchment: River Eden SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special area of conservation about 101 m away: River Eden
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 101 m away: Town End Meadows, Little Asby SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
National infrastructure project about 1.3 km away: A66 Northern Trans-Pennine Project; Nature recovery project: East of Eden.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 1 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cumbria Minerals and Waste - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Postcode
CA16 6JS
Validated
3 Sept 2026
Parish
Long Marton CP
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Jacobs - Ms Helen Donnelly

Decision outlook

Day 81, past the statutory target. 73% of full applications in Cumbria Minerals and Waste are decided within thirteen weeks, which runs to 3 Dec 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 16 Nov 2026.

Day 8125 days past the 56-day target
49%decided within 8 weeks
87%approved
158,523decided in the last year

Plota live figures for full applications decided across the UK in the last twelve months, from validation; too few recent full applications in Cumbria Minerals and Waste to go on. Cumbria Minerals and Waste decision record →

Public comments

3comments received

Last counted 16 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
7 Oct 2026