Land West of Telecommunications Station on Electricity Pylon, Church Lane, Aldington Data via plota.co.uk

OTH/2026/0883 - Screening Opinion Decided

Proposal

EIA screening opinion in regards to the construction and operation of a Synchronous Condenser (Grid Stability) Facility. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 May 2026
✓
Screening - EIA not required
around 3 Jun 2026

Screening - EIA not required around 3 Jun 2026 · Delegated Decision · Last checked 21 Aug 2026

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Stodmarsh SAC/SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Public footpath about 3 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Flood storage area
Land engineered to hold flood water and protect somewhere else.
The Environment Agency will object to anything that reduces the storage.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 200 m away: Stonestreet Green Solar
The site is about 200 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Priority habitat about 4 m away: Deciduous woodland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 13 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ashford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ashford
Application type
Screening Opinion
Postcode
TN25
Received
14 May 2026
Validated
14 May 2026
Parish
Smeeth
Case officer
Show
Target decision
4 Jun 2026
Decision
Screening - EIA not required
Decision date
around 3 Jun 2026
Decision level
Delegated Decision
Applicant
Show

Public comments

No public comments yet.

Last counted 21 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
3 Jun 2026
Ashford
Planning Authority Score
5.9/10
Average
#105 of 296 overall
Relevant to this application:
Householder decisions

Ashford is faster than most councils at deciding householder applications: #75 of 296 on speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Ashford decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #147 of 296
92%
Householder approved
Above avg (90%) #146 of 296
75%
Decided in 8 weeks
Above avg (63%) #75 of 296
40%
Extended time limit
Below avg (41%) #146 of 296
71%
Minor dwellings approved
106 decided (1-9 homes)
89%
Major dwellings approved
18 decided (10+ homes)
90%
Change of use approved
40 decided
991
Total decisions
123 refused in the year to March 2026