29 Coleshill, Swindon, SN6 7PR Data via plota.co.uk

P26/V1210/LB - Listed Building Consent Approved

Proposal

Demolition of existing brick lean-to outbuilding, and replacement with new brick and timber lean-to outbuilding in an altered location Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
16 Apr 2026
Approved
24 Jun 2026

Approved on 24 Jun 2026 · Delegated · Last checked 6 Sept 2026

Site constraints 3

Coleshill Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map, which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Vale of White Horse - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
SN6 7PR
Received
16 Apr 2026
Validated
16 Apr 2026
Case officer
Show
Target decision
26 Jun 2026
Decision
Listed Building Consent is Granted
Decision date
24 Jun 2026
Decision level
Delegated
Applicant
Show
Agent
Yiangou Architects Ltd

How this decision compares

Decided in 69 days from validation, 6 days slower than Vale of White Horse's median of 63 for extensions. Approved, as 99% of extensions here are.

33%decided within 8 weeks
99%approved
156decided in the last year

Plota live figures for extensions decided by Vale of White Horse in the last twelve months, from validation. Vale of White Horse decision record →

Public comments

No public comments yet.

Last counted 6 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
11 May 2026
Comments by
12 Jun 2026
Site or press notice
28 May 2026
Statutory expiry
26 Jun 2026
Vale of White Horse
Planning Authority Score
4.5/10
Below average
#176 of 296 councils
Relevant to this application:
Other decisions

Vale of White Horse ranks #198 out of 296 councils for householder decision speed. 51% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Vale of White Horse decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #32 of 296
96%
Householder approved
Above avg (90%) #64 of 296
57%
Decided in 8 weeks
Below avg (63%) #198 of 296
51%
Extended time limit
Above avg (41%) #232 of 296
86%
Minor dwellings approved
83 decided (1-9 homes)
88%
Major dwellings approved
16 decided (10+ homes)
90%
Change of use approved
31 decided
1,015
Total decisions
51 refused in the year to March 2026