Cumnor, Oxford, OX2 9PT Data via plota.co.uk

P26/V1118/FUL - Full Application Consultation Period

Proposal

Side and rear extensions and subdivision into two dwellings. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Apr 2026
Decision
Expected by 12 Jun 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 15 Oct 2026; it is now day 175.

Comments are open until 15 Oct 2026

Comment on this application ↗

Site constraints 7

Neighbourhood Plan Areas
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National infrastructure project about 745 m away: Botley West Solar Farm
The site is about 745 m from the project boundary. Generating station, awaiting the Secretary of State's decision.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Neighbourhood Plan Areas: Cumnor Neighbourhood Plan Area | District Boundaries VALECouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
SSSI about 412 m away: Hurst Hill SSSI; Inside the Chawley built-up area; Green belt about 83 m away: Oxford; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Vale of White Horse - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
OX2 9PT
Received
17 Apr 2026
Validated
17 Apr 2026
Case officer
Show
Target decision
12 Jun 2026
Decision level
Committee
Applicant
Show
Agent
NS Surveying and Design

Decision outlook

Day 175, past the statutory target. 83% of extensions in Vale of White Horse are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 1 Oct 2026.

Day 1757 days to the predicted decision (day 182)
45%decided within 8 weeks
98%approved
430decided in the last year

Plota live figures for extensions decided by Vale of White Horse in the last twelve months, from validation. Vale of White Horse decision record →

Public comments

No public comments yet.

Last counted 1 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
24 Sept 2026
Comments by
15 Oct 2026
Statutory expiry
12 Jun 2026
Vale of White Horse
Planning Authority Score
4.5/10
Below average
#176 of 296 councils
Relevant to this application:
Householder decisions

Vale of White Horse ranks #198 out of 296 councils for householder decision speed. 51% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Vale of White Horse decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #32 of 296
96%
Householder approved
Above avg (90%) #64 of 296
57%
Decided in 8 weeks
Below avg (63%) #198 of 296
51%
Extended time limit
Above avg (41%) #232 of 296
86%
Minor dwellings approved
83 decided (1-9 homes)
88%
Major dwellings approved
16 decided (10+ homes)
90%
Change of use approved
31 decided
1,015
Total decisions
51 refused in the year to March 2026