Elder House Anderby Road Chapel St Leonards Lincolnshire PE24 5XQ Data via plota.co.uk

00696/26/DPC - Discharge of Planning Conditions Decided

Proposal

Discharge condition no. 3 (written scheme of investigation) imposed on . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Apr 2026
✓
Consultation
7 May 2026
✓
Responded
12 Jun 2026

Responded on 12 Jun 2026 · Delegated Decision · Last checked 2 Sept 2026

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 3 decided (outcome not recorded)

    • ConditionsDischarge condition no. 3 (written scheme of investigation).This application00696/26/DPC

Site constraints 8

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Local nature reserve 105 m away: Lincolnshire Coastal Country Park
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 103 m away: Sea Bank Clay Pits SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
National infrastructure project 962 m away: Outer Dowsing Offshore Wind (Generating Station)
The site is 962 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Ingoldmells and Chapel St Leonards built-up area; Priority habitat 29 m away: Coastal sand dunes; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £290,000 in June 2021. Detached house, freehold.

30 June 2021£290,000Recorded as a transfer outside a standard sale
11 June 2007£300,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area108 m² (1,163 sq ft)
Energy ratingD (59 out of 100), could reach B
PropertyDetached house, 4 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSandstone or limestone, as built, no insulation (assumed)

From the energy performance certificate lodged in June 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Discharge of Planning Conditions
Postcode
PE24 5XQ
Received
27 Apr 2026
Validated
27 Apr 2026
Ward
Chapel St. Leonards Ward
Parish
Chapel St. Leonards
Case officer
Show
Target decision
22 Jun 2026
Decision
Responded
Decision date
12 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
PMC Land and Planning Limited
Freehold owner
Show

Public comments

No public comments yet.

Last counted 2 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14889603
Planning Portal ref
PP-14889603
Consultation
7 May 2026
Comments by
29 May 2026
Statutory expiry
22 Jun 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 overall
Relevant to this application:
Householder decisions

East Lindsey is #182 of 296 councils on householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.