Almora, Silver Street, Hordle SO41 0FN Data via plota.co.uk

26/11024 - Full Planning Permission Registered

Proposal

Single-storey rear extension; dormer to facilitate creation of first floor and fenestration alterations Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Nov 2026
✓
Validated
4 Nov 2026
✓
Consultation
4 Nov 2026
Decision
Expected by 30 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 24 Dec 2026, from New Forest (District)'s recent extensions.

Comments are open until 4 Dec 2026

Comment on this application ↗

Site constraints 6

Green belt: South West Hampshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project: Navitus Bay Wind Park
The site is inside the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
National park 30 m away: New Forest
Outside the park; its setting can still be raised.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Also on the record
Inside the Ashley (New Forest) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 5 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area149 m² (1,604 sq ft)
Energy ratingC (70 out of 100)
PropertyDetached house, 5 habitable rooms
Built1967 to 1975
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in August 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in New Forest (District) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
SO41 0FN
Received
2 Nov 2026
Validated
4 Nov 2026
Ward
Milford & Hordle
Parish
Hordle
Case officer
Show
Target decision
30 Dec 2026
Applicant
Show

Decision outlook

Day 14 of the 56-day target. New Forest (District) usually decides extensions by day 50.

Day 1442 days to the 56-day target
77%decided within 8 weeks
93%approved
602decided in the last year

Plota live figures for extensions decided by New Forest (District) in the last twelve months, from validation. New Forest (District) decision record →

Public comments

No public comments yet.

Last counted 12 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15337642
Planning Portal ref
PP-15337642
Consultation
4 Nov 2026
Comments by
4 Dec 2026
Env. assessment
No
New Forest (District)
Planning Authority Score
7.8/10
Good
#29 of 296 councils
Relevant to this application:
Householder decisions

New Forest (District) is faster than most councils at deciding householder applications, ranking #37 out of 296. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (District) decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #112 of 296
96%
Householder approved
Above avg (90%) #54 of 296
80%
Decided in 8 weeks
Above avg (63%) #37 of 296
35%
Extended time limit
Below avg (41%) #103 of 296
69%
Minor dwellings approved
87 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
78%
Change of use approved
40 decided
885
Total decisions
85 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use